<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Aydın Law</title>
	<atom:link href="https://www.aydin.law/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.aydin.law/</link>
	<description>Welcome</description>
	<lastBuildDate>Fri, 10 Apr 2026 11:34:50 +0000</lastBuildDate>
	<language>tr</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.aydin.law/wp-content/uploads/2024/08/cropped-Untitled-2-32x32.jpg</url>
	<title>Aydın Law</title>
	<link>https://www.aydin.law/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Critical Amendments In Unlicensed Generation: New Regulations On Hourly Netting, Storage And The Consumption Relationship</title>
		<link>https://www.aydin.law/2026/04/10/critical-amendments-in-unlicensed-generation-new-regulations-on-hourly-netting-storage-and-the-consumption-relationship/</link>
		
		<dc:creator><![CDATA[Aydın Law]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 11:02:43 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13625</guid>

					<description><![CDATA[<p>I. INTRODUCTION The Regulation on Unlicensed Electricity Generation in the Electricity Market (the “Regulation”), published in the Official Gazette dated 12 May 2019 and numbered 30772, constitutes the primary legislation governing the procedures and principles applicable to unlicensed electricity generation activities. Significant and systematic amendments...</p>
<p><a href="https://www.aydin.law/2026/04/10/critical-amendments-in-unlicensed-generation-new-regulations-on-hourly-netting-storage-and-the-consumption-relationship/">Critical Amendments In Unlicensed Generation: New Regulations On Hourly Netting, Storage And The Consumption Relationship</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13625" class="elementor elementor-13625">
						<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-eb664bd elementor-widget elementor-widget-text-editor" data-id="eb664bd" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
			<style>/*! elementor - v3.23.0 - 25-07-2024 */
.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}</style>				<p><strong>I. INTRODUCTION</strong></p><p id="ember1377" class="ember-view reader-text-block__paragraph">The Regulation on Unlicensed Electricity Generation in the Electricity Market (the “<strong>Regulation</strong>”), published in the Official Gazette dated 12 May 2019 and numbered 30772, constitutes the primary legislation governing the procedures and principles applicable to unlicensed electricity generation activities. Significant and systematic amendments have been introduced to the said Regulation through the Regulation Amending the Regulation on Unlicensed Electricity Generation in the Electricity Market (the “<strong>Amendment Regulation</strong>”), published in the Official Gazette dated 2 April 2026 and numbered 33212.</p><p id="ember1378" class="ember-view reader-text-block__paragraph">The regulations introduced by the Amendment Regulation are of a nature to reshapes the fundamental parameters of the unlicensed generation model. In this context, the reconfiguration of the netting mechanism from a monthly basis to an hourly basis, the subjection of the relationship between production and consumption to stricter technical and legal criteria, and the clarification of the framework regarding storage activities are noteworthy.</p><p><strong>II. FUNDAMENTAL PRINCIPLES</strong></p><p id="ember1380" class="ember-view reader-text-block__paragraph"><strong>1. How Has the Transition to the Hourly Netting System Been Regulated by the Amendment Regulation?</strong></p><p id="ember1381" class="ember-view reader-text-block__paragraph">Prior to the Amendment Regulation, netting transactions were conducted (<em>setting aside thehierarchy of norms and taking into consideration the nature of special-general regulations</em>)pursuant to (i) the Regulation, (ii) the Board Decision numbered 11917 (the “<strong>Board Decision</strong>”), published in the Official Gazette dated 24 June 2023 and numbered 32231, and (iii) the Law No. 5346 on the Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy (the “<strong>YEK Law</strong>”).</p><p id="ember1382" class="ember-view reader-text-block__paragraph">During the period in which the monthly netting structure was applicable, the arrangement established by the Board Decision led to the result of an SPP established for self-consumption purposes acquiring a form of “<em>IPP – independent power producer</em>” character, if the production and consumption points were located in two separate distribution / supply regions. Accordingly, the portion of electricity matching the consumption was evaluated based on the last resort supply tariff, where the relevant consumer was within the scope of such tariff; whereas, provided that it remained within the annually monitored sales limit, the excess production was evaluated on the basis of the unit prices set forth in the tariff tables.</p><p id="ember1383" class="ember-view reader-text-block__paragraph">Accordingly, even if a differentiation in terms of unit price was present, an invoice was issued for the entirety of the produced electricity, and the corresponding amount was collected from the incumbent supply company within the determined term. On the other hand, the consumer was obliged to pay the equivalent of the electricity at the consumption point to its supplier within the framework of bilateral agreement provisions.</p><p id="ember1384" class="ember-view reader-text-block__paragraph">With the Amendment Regulation, it is observed that the netting mechanism, which was previously carried out in practice on a “<em>monthly</em>” basis, has been reorganized to be based on an “<em>hourly</em>” time period. From a purposive interpretation, we are of the opinion that this fundamental change has essentially been issued with the expectation of synthetically constructing a “<em>behind-the-meter netting</em>” paradigm similar to rooftop SPPs. Indeed, with the Amendment Regulation, the concept of netting has been redefined and expressed as “the process of finding the net production or net consumption value in kWh as a result of offsetting production and consumption occurring within an hourly time period.”</p><p>In this case, during the first 10-year operation period of unlicensed SPPs, within the framework of the operation of the hourly netting mechanism, we are of the opinion that, considering the data set collected, managed, and coordinated by Energy Exchange Istanbul (“<strong>EXIST</strong>&#8220;), and taking into account the letter of the Amendment Regulation, three different situations may theoretically arise; however, whether this configuration will be implemented in practice in the same manner will gain clarity within the framework of the procedures and principles to be updated and published by the EMRA and explanatory additional regulations regarding settlement processes.</p><p>• In the event that consumption exceeds production in the relevant time period, the difference shall be characterized as net consumption; while no separate invoice is issued for production, an invoice shall be issued to the consumer by the supplier based on the net consumption amount, taking the current electricity consumption cost as the basis.</p><p>• In the event that production and consumption are equal, no invoicing shall be in question.</p><p>• In the event that production exceeds consumption, the difference shall be evaluated as “<em>surplus energy</em>”; the price regarding this energy shall be determined within the scope of Schedule No. I annexed to the YEK Law (<em>based on the unit prices set forth in the tariff tables</em>), and shall be invoiced by the consumer depending on its purchase by the incumbent supply company within the framework of the relevant legislation</p><p>In all cases, the unit benefit provided by the electricity subject to netting must be deemed equal to the unit supply cost of the relevant commodity.</p><p>It is observed that the “<em>miracle</em>” of hourly netting does not lie in the unit price at which the produced electricity will be evaluated. On the contrary, provided that the consumption profile of the relevant consumer is taken as the basis, this practice may result in reaching the annual limit on the sale of excess electricity (<em>permission to sell up to one times the consumption</em>) more rapidly. This is because, within the monthly netting structure, a neutralization is carried out based on approximately 720 hours. Undoubtedly, in the monthly netting regime, the breadth of the sample group serves a function of reducing uncertainty and imbalance. This flexibility does not exist in the new system.</p><p id="ember1389" class="ember-view reader-text-block__paragraph">As briefly mentioned above, it is understood that, under the hourly netting system introduced by the Amendment Regulation, the calculation and settlement processes will be carried out by EXIST, the market operator, and that, within this scope, production and consumption data provided by the relevant grid operators will be consolidated into a single source and rendered suitable for settlement.</p><p id="ember1390" class="ember-view reader-text-block__paragraph">Within this framework, netting transactions will be carried out by EXIST, and accordingly the payment amounts will be calculated, and payment and invoicing processes will continue to be carried out through incumbent supply companies based on the calculated amounts. Within this scope, it is clear that the settlement process carried out by EXIST performs a technical balancing and netting function by comparing production and consumption data for each hour.</p><p id="ember1391" class="ember-view reader-text-block__paragraph">Within the framework of the current regulations, it is understood that there is a tendency towards a change in the existing structure established by the Board Decision. In other words, it is expected that the implementation principles regarding the netting system will be determined and clarified by a new Board Decision to be adopted in this direction. In this respect, in order to make a final and sound assessment on the matter, it is necessary to follow the procedures and principles to be published by the Energy Market Regulatory Authority.</p><p id="ember1392" class="ember-view reader-text-block__paragraph">At this juncture, we would like to state that, when the evolution of the market and the historical tendencies of the rule-maker are observed; in the current situation, the reference made to the tariff table with respect to the sale of excess energy may, over time, be updated towards the market clearing price (MCP) through an amendment to the law or by a Presidential decision. This is because the tariff, by its nature, is an umbrella covering subsidized groups. A pricing mechanism aligned with market formation (<em>and therefore to – MCP</em>) will also be in line with the fundamental mantra of self-consumption investments.</p><p id="ember1393" class="ember-view reader-text-block__paragraph"><strong>2.  What Are the Regulations Introduced with Respect to Storage Activities in Unlicensed Generation Facilities?</strong></p><p id="ember1394" class="ember-view reader-text-block__paragraph">When the regulations concerning storage activities within the scope of unlicensed generation facilities are examined, it is regarding storage activities within the scope of unlicensed generation facilities are examined as a whole, it is observed that permitting the establishment of storage units does not constitute a new approach, and that such possibility had already existed previously. Indeed, pursuant to the Regulation on Storage Activities in the Electricity Market, published in the Official Gazette dated 9 May 2021 and numbered 31479, it was possible to establish electricity storage facilities in unlicensed generation facilities that had received a call letter within the scope of the Regulation and where netting was applied for surplus energy. However, it was made mandatory that such storage facilities meet certain technical and legal conditions; in particular, it was explicitly regulated that no payment would be made for the energy remaining as surplus after netting with respect to the energy supplied to the grid from storage facilities. Even, in cases where the amount of energy supplied from the storage unit could not be separately determined, it was envisaged that the entirety of the surplus energy would be evaluated without consideration, and such energy was deemed to have been generated by the incumbent supply company within the scope of YEKDEM and reflected to the system as a gratuitous contribution.</p><p id="ember1395" class="ember-view reader-text-block__paragraph">Within this framework, it is understood that the regulations introduced by the Amendment Regulation, rather than establishing an entirely new system, render the existing structure more explicit and systematic. Indeed, with the new regulation, the establishment of integrated storage units in unlicensed generation facilities has been expressly permitted, and it has been stipulated that the capacity of such units may not exceed the electrical capacity of the generation facility.</p><p id="ember1396" class="ember-view reader-text-block__paragraph">On the other hand, the approach that the energy supplied to the grid from storage units is not evaluated within the scope of the support mechanism has been maintained; within this scope, it has been explicitly regulated that no payment shall be made for the energy supplied to the system from the storage unit that remains as surplus after netting. In addition, in cases where the energy supplied from the storage unit cannot be separately determined, it has been envisaged that no payment shall be made for the entirety of the surplus energy, thereby confirming the previous approach and establishing a clearer framework for implementation.</p><p id="ember1397" class="ember-view reader-text-block__paragraph">When these regulations are evaluated together, it is understood that, although it is possible to establish integrated storage units in unlicensed generation facilities, due to the fact that the energy supplied to the grid from the storage unit is not evaluated within the scope of any payment mechanism, it is not possible to generate income by storing energy during low-price hours and supplying it to the grid during high-price hours. In other words, storage units that would provide a flexibility mechanism within the scope of unlicensed electricity generation will essentially be used for “peak shaving” purposes; at present, it does not appear possible for them to be allocated to arbitrage.</p><p id="ember1398" class="ember-view reader-text-block__paragraph"><strong>3. What Are the Regulation Introduced with Respect to the Association of Consumption Facilities with the Generation Facility?</strong></p><p id="ember1399" class="ember-view reader-text-block__paragraph">With the Amendment Regulation, within the scope of transfer transactions, the new consumption facility or facilities intended to be associated with the generation facility must have the following characteristics:</p><p>• Based on the date on which the generation facility obtained the connection agreement call letter, the total of the contracted capacities in the connection agreements of the relevant consumption facilities;</p><p style="padding-left: 40px;">• In the event that the call letter has been obtained after 12 May 2019, (i) provided that the exceptions set forth in the Regulation are reserved, it must not be less than the installed capacity of the generation facility, (ii) where the generation facility falls within the scope of subparagraph (h) of paragraph one of Article 5 of the Regulation and the associated consumption facility or facilities belong to municipalities, their affiliated entities, industrial facilities, or agricultural irrigation subscribers, the said total must not be less than the contractual capacity forming the basis of the application in cases where the installed capacity of the generation facility is greater than this total, and must not be less than the installed capacity of the generation facility in cases where the total of the contracted capacities is greater than the installed capacity of the generation facility</p><p style="padding-left: 40px;">• In the event that the call letter has been obtained before 12 May 2019, the total of the contracted capacities in the connection agreements of the relevant consumption facility or facilities must not be less than the contractual capacity forming the basis of the application in cases where the installed capacity of the generation facility is greater than the contractual capacity forming the basis of the application, and must not be less than the installed capacity of the generation facility in cases where the contractual capacity forming the basis of the application is greater than the installed capacity of the generation facility</p><p>• For generation facilities that have been entitled to receive a connection agreement call letter as a result of the priority evaluation and for which a connection agreement has been executed, the total annual electrical energy consumption of the new consumption facility or facilities to be associated with the generation facility must not be less than the consumption amount forming the basis of the application.</p><p><strong>III. CONCLUSION</strong></p><p id="ember1405" class="ember-view reader-text-block__paragraph">While the fundamental structure of the unlicensed generation system has been preserved with the Amendment Regulation, the rules regarding the functioning of the system have been made more explicit through the transition of the netting mechanism to hourly principles, the establishment of a clearer framework for the regulations on storage activities, and the re-determination of the conditions regarding the consumption facilities to be associated with generation facilities on the basis of the technical and consumption data forming the basis of the application. Within this scope, it is understood that, in particular, the reflection of the hourly netting system on invoicing and settlement processes will be clarified together with the regulations for implementation.</p><p id="ember1406" class="ember-view reader-text-block__paragraph">You may access the Amendment Regulation via this <a class="EGUIDLFjNnUuFLMcXIePGvqsAOFEcAiMOO " tabindex="0" href="https://www.resmigazete.gov.tr/eskiler/2026/04/20260402-4.htm" target="_self" data-test-app-aware-link="">link</a>.</p><p><span style="background-color: #ffffff;">Makalenin Türkçe versiyonuna ulaşmak için bu </span><a href="https://mcusercontent.com/9d531adc0538c6e253442bdb6/files/ddc9040c-42d8-505a-5ad2-82a7b5b2ed3f/100426_LU_Y_MAKALE_TR.pdf">bağlantı</a>ya<span style="background-color: #ffffff;"> tıklayınız.</span></p>						</div>
				</div>
				<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2026/01/WhatsApp-Image-2026-01-28-at-2.18.44-PM-e1769683701708.jpeg" alt="Serhat Aydın">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Serhat Aydın</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Managing Partner</div>
			
			
							<div class="wpr-member-description">+90 532 242 10 28
<br>
serhat.aydin@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71 
<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2026/04/10/critical-amendments-in-unlicensed-generation-new-regulations-on-hourly-netting-storage-and-the-consumption-relationship/">Critical Amendments In Unlicensed Generation: New Regulations On Hourly Netting, Storage And The Consumption Relationship</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Amendments To The Charging Service Regulation: Pricing, Payment Processes, and User Rights in Electric Vehicle Charging Are Being Redefined</title>
		<link>https://www.aydin.law/2026/04/02/amendments-to-the-charging-service-regulation-pricing-payment-processes-and-user-rights-in-electric-vehicle-charging-are-being-redefined/</link>
		
		<dc:creator><![CDATA[Aydın Law]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 08:58:47 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13599</guid>

					<description><![CDATA[<p>I. INTRODUCTION The amendments introduced by the Regulation on the Amendment of the Charging Service Regulation (the “Regulation”), published in the Official Gazette dated 23 March 2026 and numbered 33202, demonstrate that the electric vehicle ecosystem in Türkiye has evolved from merely a growing market...</p>
<p><a href="https://www.aydin.law/2026/04/02/amendments-to-the-charging-service-regulation-pricing-payment-processes-and-user-rights-in-electric-vehicle-charging-are-being-redefined/">Amendments To The Charging Service Regulation: Pricing, Payment Processes, and User Rights in Electric Vehicle Charging Are Being Redefined</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13599" class="elementor elementor-13599">
						<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-eb664bd elementor-widget elementor-widget-text-editor" data-id="eb664bd" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
			<style>/*! elementor - v3.23.0 - 25-07-2024 */
.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}</style>				<p><strong>I. INTRODUCTION</strong></p><p>The amendments introduced by the Regulation on the Amendment of the Charging Service Regulation (the “<strong>Regulation</strong>”), published in the Official Gazette dated 23 March 2026 and numbered 33202, demonstrate that the electric vehicle ecosystem in Türkiye has evolved from merely a growing market into a more sophisticated regulatory domain. While the Regulation deepens the existing framework across various areas ranging from mobile charging solutions to data security standards, from price transparency to interoperability within the market, it also renders the obligations of market players clearer and more measurable. In this respect, the amendments do not merely constitute a technical update; they also signal a transition to a new phase in the charging services market shaped by competition, transparency, and user-centricity.</p><p><strong>II. FUNDAMENTAL PRINCIPLES</strong></p><p>An examination of the Regulation indicates that, particularly from the users’ perspective, the pricing structure has been significantly simplified, as charging service fees are now to be applied solely in TL/kWh and no additional fees may be charged under any other name. Furthermore, mandating card and contactless payment options at certain charging units and explicitly prohibiting additional charges for such methods enhance accessibility and make the process more practical for users. In addition, it is understood that the concept of a charging network has been expanded to include mobile charging stations and interoperability mechanisms, that data security obligations are being aligned with international standards, and that service quality is aimed to be improved through regulations enabling users to access real-time information regarding price, availability, and service conditions. The key amendments are summarized below under separate headings:</p><ul><li><strong>Simplified Pricing: Single Fee, Clear Rules<br /></strong><p> </p></li></ul><p>With the amendments, the pricing structure of charging services has been significantly simplified. Pricing will now be based solely on TL/kWh, and no additional fees—such as connection fees, transaction initiation fees, or equipment usage fees—may be charged under any name beyond the amount calculated based on the charging service price. This constitutes an important step towards ensuring that users can clearly understand what they are paying for. In addition, transparency has been strengthened by requiring prices to be shared in real time through digital channels and at charging stations.</p><p>Operators are also allowed to apply discounted pricing based on the time of day and the location of the station. However, an important rule protects users: even if prices change after charging has started, the user will pay according to the price applicable at the time the transaction began. Since such discounted prices must be clearly communicated to users and notified to the Energy Market Regulatory Authority (“<strong>Authority</strong>”), the system is intended to operate in a transparent and controllable manner.</p><ul><li><strong>Introduction of Congestion Management at Charging Stations<br /></strong><p> </p></li></ul><p>An important step has been taken towards more efficient management of congestion at charging stations. In DC charging units, once a vehicle’s battery level reaches 85% or above, the charging service may be terminated, provided that the user has been informed in advance. This mechanism aims to improve the efficiency of station usage and enable more users to access the service during peak hours. However, it remains unclear how such notifications will be made and to what extent users will be able to anticipate this process. This issue will be particularly significant for users planning long-distance travel.</p><ul><li><strong>Card and Contactless Payment Options Clearly Regulated<br /></strong><p> </p></li></ul><p>At newly added charging stations on highways under the responsibility of the General Directorate of Highways, at least one of the DC charging units with a capacity of 50 kW or above must provide card or contactless payment options. This requirement will come into force as of 1 July 2026. Moreover, no additional fees, commissions, or price differences may be charged to users for these payment methods. This regulation is expected to facilitate access to charging services and make the process more practical for users.</p><ul><li><strong>Expansion of the Charging Network Definition: A Growing System<br /></strong><p> </p></li></ul><p>The Regulation no longer considers charging services as limited to physical stations. Structures such as mobile charging stations, smart charging systems, and interoperability between different networks (roaming) have been explicitly included within the system. Accordingly, the charging network is now approached as a more holistic structure encompassing both software and hardware. This indicates that the sector has expanded both technically and commercially.</p><p>In this context, particular attention should be drawn to the contractual structure of roaming arrangements introduced by the Regulation. Indeed, this aspect entails legal and operational considerations that must be evaluated both from the perspective of prospective roaming “contracting parties” holding a charging network operator license and from the perspective of users.</p><p>Within the Regulation, roaming agreements are defined as agreements enabling charging network operators to directly provide services to each other’s users and covering data and payment flows. Furthermore, it is stipulated that contracting parties holding a charging network operator license must notify the Authority within 30 days following the execution of such roaming agreements. In addition, the Authority is authorized to determine the procedures and principles, as well as the necessary protocols, regarding activities carried out under roaming agreements.</p><p>This approach demonstrates that, on the one hand, the regulatory authority may guide the general framework in the forthcoming period; however, in the absence of any protocol or secondary legislation issued by the Authority at this stage, the current practice is expected to be shaped largely within the framework of contractual freedom between the parties in other words, a structure in which the framework is effectively filled in by the parties themselves. Nevertheless, it should also be taken into consideration that, should mandatory provisions arise through future regulations and protocols to be issued by the Authority, existing agreements will need to be reviewed and adapted accordingly.</p><p>In this context, in roaming relationships, it is essential that matters such as data sharing, management of payment and collection processes, revenue sharing, service continuity and quality standards, and allocation of responsibilities between the parties are clearly and comprehensively regulated within the agreements. In particular, the structuring of the collection mechanism (including which party will collect payment from the user and how reconciliation and transfer processes between the parties will operate) stands out as a critical area in terms of both managing commercial risks and ensuring operational continuity.</p><p>From the user (consumer) perspective, it is also necessary for the roaming structure to be transparent and predictable. Regardless of which network the user receives the service from, clear information should be provided regarding pricing, payment, and service conditions; it should be clarified who the counterparty is in case of disruptions arising from services provided across different operators; and liability in potential disputes should be clearly determined. Therefore, roaming agreements should be considered not only as instruments governing commercial relations between parties but also as structures that directly affect user experience and trust.</p><ul><li><strong>Clarification of Operator&#8217;s Authorities and Notification and Application Processes for Charging Activities<br /></strong><p> </p></li></ul><p>It is observed that the framework regarding the authorities and obligations of charging network operators has also been further clarified. Activities such as the establishment and operation of a charging network, the operation of mobile charging stations, the contractual relationships established with users, and the execution of practices related to invoicing and the collection of fees within the scope of charging services are regulated under the license regime. In addition, it appears that notification and application processes concerning the integration of new stations into the network, the transfer of existing stations, and mobile charging activities have been simplified and rendered more traceable. Accordingly, in the event of the transfer of charging stations from one charging network operator to another, both the transferring and the transferee operators are required to notify the Authority electronically, and following the approval of such notifications by the Authority, a further notification must be made to the relevant charging network operator. Within this process, it is stipulated that the certificate of favorable opinion issued in the name of the transferring operator shall be revoked and reissued in the name of the transferee operator.</p><ul><li><strong>Strengthening of User-Oriented Service Approach; Introduction of Certification Requirement for Software Systems in Information Security<br /></strong><p> </p></li></ul><p>With the amendments, significant obligations have also been introduced in the areas of user experience and data security. Accordingly, charging network operators are required to establish communication channels through which user complaints can be submitted and tracked, and to set up or procure a call center certified under ISO 18295 that will operate on a 24/7 uninterrupted basis. In addition, it has been made mandatory to provide real-time information regarding the status and availability of stations and sockets, as well as pricing information, and to ensure that user requests are resolved within specified time periods. A transition period of six months has been granted to existing license holders for the implementation of these requirements.</p><p>On the other hand, the bar has been significantly raised in terms of data security. While it has become mandatory to ensure the protection of data obtained within the scope of charging services, to prevent unauthorized access, and to operate IT infrastructure in compliance with international standards, it is explicitly regulated that systems must comply with the TS ISO/IEC 27001 standard. Within this scope, ensuring elements such as authentication, access control, and secure communication becomes a fundamental obligation for operators. A transition period of one year has been granted to existing license holders for the fulfillment of these obligations.</p><p><strong>III. CONCLUSION</strong></p><p>Overall, the amendments aim to establish a more transparent, predictable, and user-oriented structure in the charging services market. The regulations introduced across various areas from pricing and payment processes to data security and operational obligations not only require technical compliance from market players but also bring about a more systematic and standardized approach to business practices.</p><p>In particular, the simplification of the pricing structure, the expansion of direct payment options, and the enhancement of the level of information provided to users stand out as significant developments directly affecting user experience. However, certain areas such as congestion management will need to be closely monitored in the coming period in terms of how they will be implemented and whether uniformity can be achieved across the market.</p><p>Furthermore, with the expansion of the definition of the charging network, it is understood that the contractual relationships to be established within the scope of interoperability (roaming) will play a critical role in shaping the practice, particularly in terms of data sharing, collection mechanisms, allocation of responsibilities, and service conditions reflected to users. In this respect, the proper and sustainable structuring of roaming arrangements will directly affect not only the balance between market players but also user trust and service quality.</p><p>In this framework, it would be appropriate to consider these amendments not merely as technical updates to the existing structure, but as an important component of the transition towards a more mature, competitive, and user-centered charging services market.</p><p><span style="background-color: #ffffff;">Makalenin Türkçe versiyonuna ulaşmak için bu </span><a href="https://mcusercontent.com/9d531adc0538c6e253442bdb6/files/7cf56b17-3397-0aad-4686-b50e9ed02047/02042026_MAKALE_TR.pdf">bağlantıya</a><span style="background-color: #ffffff;"> tıklayınız.</span></p>						</div>
				</div>
				<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/01/AYDIN-LAW-02-scaled-e1770107474574.jpg" alt="Serhat Aydın">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Serhat Aydın</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Managing Partner</div>
			
			
							<div class="wpr-member-description">+90 532 242 10 28
<br>
serhat.aydin@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/01/AYDIN-LAW-12-scaled.jpg" alt="Aslı Başçoban">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Aslı Başçoban</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90  534 369 24 22
<br>
asli.bascoban@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2026/04/02/amendments-to-the-charging-service-regulation-pricing-payment-processes-and-user-rights-in-electric-vehicle-charging-are-being-redefined/">Amendments To The Charging Service Regulation: Pricing, Payment Processes, and User Rights in Electric Vehicle Charging Are Being Redefined</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Digital Battery Passport For Electric Vehicles: New Regulatory Structure Within The Scope Of The EU Battery Regulation!</title>
		<link>https://www.aydin.law/2026/02/23/digital-battery-passport-for-electric-vehicles-new-regulatory-structure-within-the-scope-of-the-eu-battery-regulation/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Mon, 23 Feb 2026 08:52:01 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13581</guid>

					<description><![CDATA[<p>I. INTRODUCTION The rapid global proliferation of electric vehicles and renewable energy systems has transformed batteries from being merely a technical energy storage component into a strategic product category with environmental, social, and legal impacts throughout their entire life cycle, extending from production to recycling....</p>
<p><a href="https://www.aydin.law/2026/02/23/digital-battery-passport-for-electric-vehicles-new-regulatory-structure-within-the-scope-of-the-eu-battery-regulation/">Digital Battery Passport For Electric Vehicles: New Regulatory Structure Within The Scope Of The EU Battery Regulation!</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13581" class="elementor elementor-13581">
						<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-eb664bd elementor-widget elementor-widget-text-editor" data-id="eb664bd" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p id="ember3685" class="ember-view reader-text-block__heading-3"><strong>I. INTRODUCTION</strong></p><p id="ember3686" class="ember-view reader-text-block__paragraph">The rapid global proliferation of electric vehicles and renewable energy systems has transformed batteries from being merely a technical energy storage component into a strategic product category with environmental, social, and legal impacts throughout their entire life cycle, extending from production to recycling. Batteries now occupy the center of a multi-layered value chain directly linked to the supply of critical raw materials, carbon-intensive production processes, circular economy objectives, and waste management policies. The European Union’s Battery Regulation (<em>Regulation (EU) 2023/1542</em>) (the “<strong>Regulation</strong>”) introduces a comprehensive sustainability framework and signifies a transition from traditional product safety rules to life cycle-based regulatory oversight.</p><p id="ember3687" class="ember-view reader-text-block__paragraph">The digital battery passport, one of the most innovative instruments of the Regulation, will become mandatory in the European Union as of 18 February 2027 for electric vehicle batteries, batteries for light means of transport, and industrial batteries with a capacity greater than 2 kWh. This system, which provides batteries with a unique digital identity, enables the monitoring of carbon footprint data, recycled and renewable content rates, information on critical and hazardous substances, technical performance, state of health, repair, repurposing for reuse, dismantling and durability parameters, as well as data relating to the usage process. Thus, the digital battery passport is positioned not only as an information tool ensuring environmental transparency, but also as a compliance mechanism that supports market surveillance, strengthens supply chain governance, and constitutes a condition for market access.</p><p id="ember3688" class="ember-view reader-text-block__paragraph">This article examines, within the framework of the Regulation, the legal, technical, and commercial dimensions of the digital battery passport system, including the regulatory consequences arising particularly with respect to electric vehicle batteries, the data categories within the scope of the passport and the access regime, the allocation of responsibilities, the technical infrastructure and data governance model, the compliance obligations arising for Türkiye, and the effects of the Regulation on global trade and competition.</p><p id="ember3689" class="ember-view reader-text-block__heading-3"><strong>FUNDAMENTAL PRINCIPLES</strong></p><p id="ember3690" class="ember-view reader-text-block__paragraph"><strong>1. Who Can Access the Information Contained in Digital Battery Passports?</strong></p><p id="ember3691" class="ember-view reader-text-block__paragraph">Access to the information contained in the digital battery passport is regulated under the Regulation according to three separate categories. This access regime shall also be directly applicable to electric vehicle batteries for which possession of a digital battery passport has become mandatory as of 18 February 2027. The first category consists of publicly available information. Within this scope, chemical composition including hazardous and critical raw materials, carbon footprint data, recycled and renewable content rate, technical parameters such as capacity, voltage and power limits, cycle life, energy efficiency, commercial warranty period, the European Union declaration of conformity, and information relating to waste management are accessible to everyone. This information may be displayed via a QR code. The scope of the publicly available information set is regulated in detail in Annex XIII, Part 1 of the Regulation.</p><p id="ember3692" class="ember-view reader-text-block__paragraph">The second category consists of information accessible only to “<em>persons with a legitimate interest.</em>” Pursuant to the Regulation, these persons include economic operators carrying out activities related to repair, remanufacturing, preparation for reuse, repurposing, or recycling of batteries (<em>repairers, remanufacturers, second-life operators and recyclers</em>), as well as the battery owner or parties acting on their behalf who wish to make the individual battery available to independent energy aggregators or energy market participants. This category includes both detailed technical data relating to the battery model and dismantling and safety information, as well as data sets specific to the individual battery; within this scope, technical composition data and performance, state of health, and usage information specific to the individual battery are included. With respect to electric vehicle batteries, these data are of particular importance in determining whether the battery is technically suitable for repurposing after the end of its vehicle service life, assessing road safety risks, accurately calculating residual value, and ensuring transparency in the second-hand electric vehicle market. The scope of this information and data set is regulated under Annex XIII, Part 2 and Part 4 of the Regulation, and the scope and limits of access shall be clarified by implementing acts to be adopted by the European Commission.</p><p id="ember3693" class="ember-view reader-text-block__paragraph">The third category consists of information accessible only to notified bodies, market surveillance authorities, and the European Commission. Within this scope are the results of test reports demonstrating compliance with the requirements laid down in the Regulation. This category of information is regulated in Annex XIII, Part 3. Accordingly, technical assessment data relating to conformity assessment shall not be accessible to the public or other economic operators and shall be limited to regulatory supervisory authorities.</p><p id="ember3694" class="ember-view reader-text-block__paragraph"><strong>2. Who Is Responsible for the Establishment, Updating, and Development of the Digital Battery Passport Regime?</strong></p><p id="ember3695" class="ember-view reader-text-block__paragraph">The responsibility for the establishment of the digital battery passport and for ensuring that it remains up to date, as a rule, belongs to the economic operator placing the battery on the market. Pursuant to the Regulation, this operator is obliged to ensure that the information contained in the passport is accurate, complete, and up to date. Although the operator placing the battery on the market may grant written authorization to another economic operator to act on its behalf, the primary responsibility arising from compliance with the passport provisions is non-transferable and remains with the operator placing the battery on the market. In the event that the status of the battery changes as a result of operations such as preparation for reuse, repurposing, or remanufacturing, the obligation relating to the digital battery passport is transferred to the economic operator that places the battery on the market again or puts it into service; in such case, a new digital battery passport must be issued that is linked to the original digital battery passport and ensures continuity of traceability.</p><p id="ember3696" class="ember-view reader-text-block__paragraph">Where the battery acquires waste status, the responsibility for fulfilling the obligations under the Regulation is transferred, within the framework of the provisions of the Regulation, to the producer, to a producer responsibility organization authorized on behalf of the producer where such an organization exists, or to the waste management operator designated pursuant to the relevant legislation. Upon the recycling of the battery, the validity of the digital battery passport terminates.</p><p id="ember3697" class="ember-view reader-text-block__paragraph">The European Commission is empowered to adopt delegated acts in order to amend the data requirements set out in Annex XIII in line with technical and scientific developments. In addition, the European Commission determines, by means of implementing acts, who qualifies as “<em>persons with a legitimate interest</em>.” and to what extent such persons may access which information. Furthermore, the amendment of the standards applicable to the unique identifier, defined as a unique character string that enables the identification of each battery and simultaneously provides a digital access link to the digital battery passport, and to the associated QR code system, or the addition of new European or international standards, is also possible through delegated acts. With regard to the implementation of technical requirements, reference to harmonized standards or, where necessary, the adoption of common technical specifications is envisaged.</p><p id="ember3698" class="ember-view reader-text-block__paragraph"><strong>3. How Has the Technical Infrastructure and Data Governance of the Digital Battery Passport Been Structured?</strong></p><p id="ember3699" class="ember-view reader-text-block__paragraph">The technical infrastructure and data governance of the digital battery passport have been regulated under the Regulation as a decentralized data system based on open standards, enabling data exchange between different digital systems and established and maintained by economic operators; this preference is based on the objective of ensuring that the system is flexible, dynamic, market-oriented, and capable of developing in line with business models and technological innovations. The system envisages that data be maintained in an automatically processable, structured, and transferable format and be designed in a manner that does not create vendor lock-in. Furthermore, it is foreseen that the accessibility of the digital battery passport shall continue even if the economic operator responsible for the obligation loses its legal personality or ceases its activities within the European Union; data authentication, integrity, security, and confidentiality are listed among the fundamental elements of the technical design.</p><p id="ember3700" class="ember-view reader-text-block__paragraph"><strong>4. How Is the Legal Framework Shaped in Türkiye with Regard to the Digital Battery Passport and Electric Vehicle Batteries?</strong></p><p id="ember3701" class="ember-view reader-text-block__paragraph">With respect to Türkiye, the digital battery passport has gained legal significance in the context of the mandatory digital identification and data disclosure system introduced by the Regulation for certain types of batteries placed on the European Union market. Decision No. 1/95 of the Association Council establishes an institutional framework for alignment with European Union product legislation; since the Regulation determines the substantive conditions for access to the European Union market, it gives rise to de facto binding effect for Turkish manufacturers exporting electric vehicles or the batteries used in such vehicles to the European Union. For placement on the European Union market, compliance with sustainability and safety criteria, fulfillment of performance and durability thresholds, observance of hazardous substance restrictions, submission of a carbon footprint declaration, and, as of 18 February 2027, the creation of a digital battery passport for the above-mentioned battery categories are required.</p><p id="ember3702" class="ember-view reader-text-block__paragraph">Products subject to European Union legislation are controlled within the framework of cooperation between customs authorities and market surveillance authorities pursuant to Regulation (EU) 2019/1020; the release for free circulation of products lacking the required documentation or giving rise to suspicion of non-compliance with applicable European Union legislation may be suspended, and where non-compliance is established, their placing on the market may be prohibited and they may not be permitted to enter into free circulation. This situation may also give rise to direct commercial consequences with respect to electric vehicle exports. For this reason, the digital passport, beyond being merely a technical obligation from Türkiye’s perspective, plays a de facto decisive role in access to the European Union market. Indeed, the Ministry of Trade of the Republic of Türkiye has stated that batteries to be used in vehicles supplied to the European Union must comply with the criteria introduced by the Regulation, and that such products may be placed on the European Union market provided that this compliance is verified by authorized conformity assessment bodies and the CE marking is affixed. Within this framework, for electric vehicle manufacturers, battery compliance becomes an integral part of the overall conformity assessment of the vehicle.</p><p id="ember3703" class="ember-view reader-text-block__paragraph">In Türkiye, the existing regulatory framework concerning batteries is primarily shaped on the basis of the Regulation on the Control of Waste Batteries and Accumulators (the “<strong>Waste Batteries Regulation</strong>”), published in the Official Gazette dated 31/08/2004 and numbered 25569 (within the scope of the Waste Batteries Regulation, our previously authored article titled “<em>Sustainable Waste Battery Management in Türkiye: Legal Framework and Transboundary Movements</em>” may be accessed via this <a class="WaaSksAwsJZZVZlCYNLQZoqqnBApTMDUGAATL " tabindex="0" href="https://www.linkedin.com/posts/aydinlaw_bulletin-activity-7346447895799214080-zAoV?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAEUVxiEBk-6-YlL5i_t_RcB5iIigv4F8kyo" target="_self" data-test-app-aware-link="">link</a>). The Waste Batteries Regulation predominantly governs matters such as labeling and marking obligations, hazardous substance restrictions, obligations related to placing on the market, deposit practices, and producer responsibility, within the framework of a waste management perspective. However, the current regulation does not contain technical and sector-specific provisions such as product-based carbon footprint calculation and declaration obligations for batteries, binding thresholds and verification mechanisms regarding recycled content ratios within the product, or a digital product identity or data passport system. By contrast, the Regulation adopts a holistic regulatory model covering the entire life cycle of the battery from the design stage to the end of its service life; through elements such as carbon footprint declaration, recycled content thresholds, digital access via QR code, and the digital battery passport system, it extends the regulatory approach to the stages of production and product design. In this respect, there emerges a need for the waste-focused regulation in Türkiye to be developed towards.</p><p id="ember3704" class="ember-view reader-text-block__paragraph"><strong>5. What Does the Digital Battery Passport Mean in Terms of Global Trade, Market Access, and Competition?</strong></p><p id="ember3705" class="ember-view reader-text-block__paragraph">By linking access to the European Union market to traceability and data transparency obligations, the digital battery passport system establishes technical standards that are de facto binding also for producers outside the European Union. Making placing on the market subject to sustainability and transparency criteria requires producers to be able to document their supply chain data, calculate and declare their carbon performance, and present information regarding product composition in a verifiable manner. Since, in electric vehicles, the battery constitutes a significant portion of the total cost and carbon footprint of the vehicle, obligations relating to the digital battery passport may directly affect the competitive position of vehicle manufacturers. For this reason, producers unable to meet such obligations are highly likely to fall into a disadvantageous position in terms of competing on equal terms with producers established in the European Union or other economic operators that have established compliance infrastructure, integrating into supply chains, establishing commercial relationships with large-scale buyers, and maintaining market share. Accordingly, the Regulation becomes an element that also shapes competition through regulatory compliance capacity, data management infrastructure, and the verifiability of sustainability indicators.</p><p id="ember3706" class="ember-view reader-text-block__heading-3"><strong>III. CONCLUSION</strong></p><p id="ember3707" class="ember-view reader-text-block__paragraph">The digital battery passport establishes a holistic control and transparency mechanism covering all stages from the design of the battery to the end of its service life. Particularly with respect to the electric vehicle sector, this system transforms the battery from being a technically separable component of the vehicle into an independent economic asset possessing a regulatory identity, that is traceable and capable of generating data. The collection of data such as carbon footprint declaration, recycled content ratios, technical performance, durability, and state of health under a digital identity renders sustainability objectives a concrete condition of market access. This situation necessitates that electric vehicles be assessed not only from the perspective of emission reduction, but within the framework of full life cycle sustainability. From Türkiye’s perspective, the digital battery passport creates a de facto binding area of compliance for producers exporting to the European Union and, beyond technical competence, incorporates data management capacity and supply chain transparency among the determining elements of competition; for this reason, particularly for electric vehicle and battery manufacturers, the establishment of institutional and technical infrastructure aligned with regulatory developments will be decisive in maintaining their position in the European Union market.</p>						</div>
				</div>
				<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/02/AYDIN-LAW-07-scaled-e1771836405980.jpg" alt="Necip Çiftçi">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Necip Çiftçi</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Asspciate</div>
			
			
							<div class="wpr-member-description">+90  538 775 67 94
<br>
necip.ciftci@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2026/02/23/digital-battery-passport-for-electric-vehicles-new-regulatory-structure-within-the-scope-of-the-eu-battery-regulation/">Digital Battery Passport For Electric Vehicles: New Regulatory Structure Within The Scope Of The EU Battery Regulation!</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Legal Nature Of Energy Storage Agreements And The Obligations Of The Parties</title>
		<link>https://www.aydin.law/2026/01/27/the-legal-nature-of-energy-storage-agreements-and-the-obligations-of-the-parties/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Tue, 27 Jan 2026 09:20:03 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13474</guid>

					<description><![CDATA[<p>I. INTRODUCTION Energy storage systems are structures developed to address the intermittency inherent in renewable energy sources, ensure security of electricity supply, and enable the efficient use of generated energy. As such, they have become one of the fundamental components of the energy transition. The...</p>
<p><a href="https://www.aydin.law/2026/01/27/the-legal-nature-of-energy-storage-agreements-and-the-obligations-of-the-parties/">The Legal Nature Of Energy Storage Agreements And The Obligations Of The Parties</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13474" class="elementor elementor-13474">
						<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-eb664bd elementor-widget elementor-widget-text-editor" data-id="eb664bd" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p id="ember853" class="ember-view reader-text-block__heading-3"><strong>I. INTRODUCTION</strong></p><p id="ember854" class="ember-view reader-text-block__paragraph">Energy storage systems are structures developed to address the intermittency inherent in renewable energy sources, ensure security of electricity supply, and enable the efficient use of generated energy. As such, they have become one of the fundamental components of the energy transition.</p><p id="ember855" class="ember-view reader-text-block__paragraph">The imbalance that arises when renewable energy generation does not coincide with demand may, within the framework of traditional market mechanisms, lead to economically disadvantageous outcomes such as selling electricity at low prices and purchasing it at high prices, while also creating arbitrage opportunities. At this point, energy storage systems increase system efficiency by enabling surplus generation to be stored and injected into the system during periods of high demand, while also offering investors a predictable and sustainable operating model.</p><p id="ember856" class="ember-view reader-text-block__paragraph">Although the energy storage market in Türkiye has not yet fully evolved into an independent and distinct market structure, it can be stated that the legislative infrastructure governing storage activities has largely been established in parallel with the increase in renewable energy investments and the widespread adoption of self-consumption and net-metering-based models. Energy storage agreements executed within this framework are shaped, on the one hand, by public law regulations and the supervision of administrative authorities, and on the other hand, give rise to rights and obligations under private law between the parties. Due to their atypical nature and the lack of settled practice in Türkiye, this article has been prepared based on the common characteristics of energy storage agreements currently used in practice</p><p id="ember857" class="ember-view reader-text-block__heading-3"><strong>II. FUNDAMENTAL PRINCIPLES</strong></p><p id="ember858" class="ember-view reader-text-block__paragraph"><strong>1. Which Legislation Applies to the Formation of Energy Storage Agreements?</strong></p><p id="ember859" class="ember-view reader-text-block__paragraph">Although energy storage agreements are private law contracts, they are heavily influenced by public law regulations due to the public service dimension and the strictly regulated structure of the electricity market. The following legislation is primarily taken into account in the formation and performance of such agreements:</p><p>• Electricity Market Law No. 6446</p><p>• Electricity Market Licensing Regulation</p><p>• Electricity Grid Regulation</p><p>• Regulation on Storage Activities in the Electricity Market</p><p>• Principle decisions and board decisions issued by the Energy Market Regulatory Authority (EMRA)</p><p id="ember861" class="ember-view reader-text-block__paragraph">In particular, the amendments published in the Official Gazette dated 29 December 2025 and numbered 33122 have clarified and rendered more predictable various issues, including the scope of energy storage activities, licensing regimes, integrated storage applications with generation facilities, and market activities, thereby significantly eliminating uncertainties encountered in practice.</p><p id="ember862" class="ember-view reader-text-block__paragraph">From the perspective of private law, the general provisions of the Turkish Code of Obligations No. 6098 (“<strong>TCO</strong>”) and the principles applicable to unnamed contracts apply. Furthermore, as the parties to energy storage agreements are generally real or legal persons operating commercial enterprises, the provisions of the Turkish Commercial Code No. 6102 may also become applicable depending on the circumstances of the case, particularly with respect to commercial transactions, merchant status, the principle of the prudent merchant, and commercial default.</p><p id="ember863" class="ember-view reader-text-block__paragraph"><strong>2. What Is the Nature of the Relationship Between the Storage Service Provider and the Generation Facility Owner?</strong></p><p id="ember864" class="ember-view reader-text-block__paragraph">When evaluated in terms of the operation of the energy storage agreement and the principal obligations of the parties, the relationship between the storage service provider and the generation facility owner is based on reciprocity and the allocation of responsibilities.</p><p id="ember865" class="ember-view reader-text-block__paragraph">The energy storage service provider is obliged to allocate the storage capacity to the use of the generation facility owner and to keep such capacity continuously available, technically operational, and accessible throughout the contract term. In this respect, the storage service provider ensures the continuity of energy storage activities and the security of the electricity system.</p><p id="ember866" class="ember-view reader-text-block__paragraph">Conversely, the generation facility owner is obliged to supply the energy to be stored, pay the storage fee, and grant a power of attorney to the storage service provider, where necessary, to obtain permits and carry out procedures required for the performance of the contractual activities. Through these obligations, the generation facility owner ensures the realization of the energy storage activity and the achievement of the economic purpose of the agreement.</p><p id="ember867" class="ember-view reader-text-block__paragraph">Accordingly, the relationship between the parties constitutes a reciprocal structure in which the technical and operational obligations of the storage service provider are supported by the financial and energy supply obligations of the generation facility owner.</p><p id="ember868" class="ember-view reader-text-block__paragraph"><strong>3. What Are the Obligations of the Energy Storage Service Provider?</strong></p><p id="ember869" class="ember-view reader-text-block__paragraph">The obligations of the energy storage service provider are aimed at fulfilling the technical and economic purpose of the agreement. In addition to the framework drawn by legislation, these obligations are shaped by contractual practice and international energy project precedents, and may be summarized under the following main headings:</p><p id="ember870" class="ember-view reader-text-block__paragraph"><strong>Installation and Delivery of the Storage Facility:</strong> The performance of energy storage activities depends on the existence of a storage system that enables the electricity generated at the generation facility to be stored and injected into the grid when necessary. Accordingly, one of the principal obligations of the energy storage service provider is to install and deliver, in a ready-for-use condition, a storage facility that is compatible with the technical characteristics of the generation facility and the installation site, compliant with applicable legislation, and capable of fulfilling the contractual purpose. This obligation includes the design, construction, and commissioning of the storage facility in a manner suitable for the intended use of the generation facility owner.</p><p id="ember871" class="ember-view reader-text-block__paragraph">Although this obligation resembles the contractor’s obligation to create and deliver a work under contracts for work regulated under Articles 470 et seq. of the TCO, it differs from a classical contract for work in that the storage service provider undertakes to make available a facility capable of achieving a specific result without transferring ownership. In this respect, the installation and delivery of the storage facility constitutes a unique obligation specific to energy storage agreements. In certain agreements, the storage facility is delivered as installed and ownership is transferred to the generation facility owner, in which case operation and maintenance obligations are assumed by the owner.</p><p id="ember872" class="ember-view reader-text-block__paragraph"><strong>Allocation of Storage Capacity:</strong> One of the core obligations of the energy storage service provider is the allocation of the agreed storage capacity (<em>dedicated capacity or contracted capacity</em>) for the use of the generation facility owner. The provider undertakes to make available, continuously and accessibly, a capacity enabling the storage of a certain amount of energy throughout the contract term. The allocated subject is not the storage facility itself, but the right to use a specified storage capacity, which also forms the basis for determining the storage fee.</p><p id="ember873" class="ember-view reader-text-block__paragraph">This obligation cannot be characterized as a transfer of a right of use similar to lease agreements, nor as a mere activity or duty of care under service contracts. Rather, the storage service provider undertakes, as a result obligation, to ensure that the agreed storage capacity remains technically and functionally available. Failure to maintain availability gives rise to contractual breach and liability. Where the generation facility owner fails to supply energy for storage, creditor’s default under Article 106 of the TCO may occur. Accordingly, the allocation of storage capacity is a <em>sui generis</em> obligation unique to energy storage agreements.</p><p id="ember874" class="ember-view reader-text-block__paragraph"><strong>Provision of Operation and Maintenance:</strong> Following installation and delivery, the storage service provider is obliged to commission the facility, keep it operational throughout the contract term, and perform periodic maintenance and repairs. The operation obligation is continuous in nature, while maintenance constitutes a periodically performed obligation.</p><p id="ember875" class="ember-view reader-text-block__paragraph">These obligations aim to ensure continuous availability of the facility, prevent failures, avoid performance losses, and enable proper performance of the storage service in line with the contractual purpose. In practice, compliance is assessed based on availability levels, agreed performance criteria (<em>such as capacity, efficiency, and response time</em>), and adherence to good engineering and operating practices.</p><p id="ember876" class="ember-view reader-text-block__paragraph"><strong>4. What Are the Obligations of the Generation Facility Owner?</strong></p><p id="ember877" class="ember-view reader-text-block__paragraph">Balancing in the energy market refers to maintaining the instantaneous supply-demand equilibrium between electricity generation and consumption, thereby ensuring system stability and reliability. The obligations of the generation facility owner constitute essential obligations that ensure the reciprocal and functional nature of energy storage agreements.</p><p id="ember878" class="ember-view reader-text-block__paragraph"><strong>Payment of the Storage Fee:</strong> Payment of the storage fee is the primary obligation of the generation facility owner and confers the onerous nature of the agreement. The storage fee is generally a fixed amount based on capacity. The storage service provider’s entitlement to the fee arises not from actual use of capacity, but from its allocation and availability. Accordingly, the obligation to pay arises even if the capacity is not used.</p><p id="ember879" class="ember-view reader-text-block__paragraph">This obligation resembles payment obligations in continuous performance contracts rather than lump-sum payment obligations under contracts for work. Failure to pay may entitle the storage service provider to suspend performance and activate interruption mechanisms provided under the agreement.</p><p id="ember880" class="ember-view reader-text-block__paragraph"><strong>Energy Supply:</strong> The supply of energy to be stored constitutes another contractual obligation of the generation facility owner. The storage service provider does not undertake any energy generation obligation; the energy is generally supplied from the owner’s own generation. Failure to supply energy, supply at incorrect times, or supply in violation of technical criteria constitutes a contractual breach. Non-supply may render the agreement ineffective and may qualify as debtor’s default under Article 125 of the TCO. Where improper supply causes damage to the facility, the owner’s fault must be taken into account in determining liability.</p><p id="ember881" class="ember-view reader-text-block__paragraph"><strong>Power of Attorney:</strong> In practice, the generation facility owner grants a power of attorney to the storage service provider to obtain permits, approvals, and make regulatory applications. This relationship is governed by the provisions of the TCO on agency. The agent must act within the scope of authority, in the interest of the principal, and with due care, while the principal must bear the legal consequences of acts performed within authority.</p><p id="ember882" class="ember-view reader-text-block__paragraph"><strong>5. Legal Characterization of the Agreement and Applicable Provisions</strong></p><p id="ember883" class="ember-view reader-text-block__paragraph">Energy storage agreements are not explicitly regulated under the TCO and therefore constitute unnamed contracts. Although certain obligations, such as facility installation, resemble contracts for work, the overall structure does not fully correspond to any regulated contract type. While the predominance of result obligations brings the agreement closer to contracts for work, the obligations exceed classical boundaries and exhibit a <em>sui generis</em> nature.</p><p id="ember884" class="ember-view reader-text-block__paragraph">Accordingly, the primary source for determining applicable provisions is the agreement itself. Where the agreement is silent, judicial interpretation and supplementation based on the principle of good faith and sectoral customs apply. Provisions of regulated contract types may only be applied by analogy where appropriate.</p><p id="ember885" class="ember-view reader-text-block__heading-3"><strong>III.CONCLUSION</strong></p><p id="ember886" class="ember-view reader-text-block__paragraph">Energy storage agreements are a developing contract type with significant technical elements that enhance renewable energy efficiency and supply security. Within the current legislative framework, such agreements should be recognized as <em>sui generis</em>, and the rights and obligations of the parties should be regulated in a detailed and predictable manner. In particular, clear determination of capacity allocation, performance criteria, and liability regimes is of critical importance in preventing potential disputes in practice.</p>						</div>
				</div>
				<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2026/01/WhatsApp-Image-2025-12-05-at-1.41.04-PM-e1769505317627.jpeg" alt="Sinem Sedef">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Sinem Sedef</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Legal Intern</div>
			
			
							<div class="wpr-member-description">+90  538 343 30 11
<br>
sinem.sedef@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2026/01/27/the-legal-nature-of-energy-storage-agreements-and-the-obligations-of-the-parties/">The Legal Nature Of Energy Storage Agreements And The Obligations Of The Parties</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>IBAT Communiqué For The Metal Industry: Position In Turkish Environmental Law &#038; Alignment With The EU IED</title>
		<link>https://www.aydin.law/2025/12/11/the-position-of-the-communique-on-best-available-techniques-in-metal-production-and-processing-within-turkish-environmental-legislation-and-its-compliance-with-the-eu-industrial-emissions-directive/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Thu, 11 Dec 2025 12:51:44 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13453</guid>

					<description><![CDATA[<p>I. INTRODUCTION The management of the environmental impacts of industrial activities has settled at the center of both national legal policies and international obligations in recent years. In particular, the metal production and processing sector, a crucial component of heavy industry, has become one of...</p>
<p><a href="https://www.aydin.law/2025/12/11/the-position-of-the-communique-on-best-available-techniques-in-metal-production-and-processing-within-turkish-environmental-legislation-and-its-compliance-with-the-eu-industrial-emissions-directive/">IBAT Communiqué For The Metal Industry: Position In Turkish Environmental Law &#038; Alignment With The EU IED</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13453" class="elementor elementor-13453">
				<div class="elementor-element elementor-element-146d959 e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no e-con e-parent" data-id="146d959" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-c8e1857 elementor-widget elementor-widget-text-editor" data-id="c8e1857" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p><b>I. INTRODUCTION</b></p><p>The management of the environmental impacts of industrial activities has settled at the center of both national legal policies and international obligations in recent years. In particular, the metal production and processing sector, a crucial component of heavy industry, has become one of the areas most strictly regulated by environmental legislation due to its high energy consumption, intense greenhouse gas and pollutant emissions, and significant generation of wastewater and solid waste. Restructuring this sector under the headings of both combating climate change and green transition emerges not only as an environmental preference but also as a legal and economic necessity.</p><p>With the Regulation on the Management of Industrial Emissions (“<b>Regulation</b>”) dated January 14, 2025, a new regime based on the principle of <b>integrated pollution prevention</b> and control has been adopted in Türkiye, abandoning the classical approach that focused merely on specific pollutant types of industrial origin. In this new era, it is deemed insufficient for facilities to merely comply with singular emission limits; beyond this, they are expected to reach the level of “<i>Best Available Techniques</i>” (“<b>BAT</b>”) regarding their production processes as a whole and to meet the BAT-Associated Emission Levels (“<b>BAT-AEL</b>”), which express the performance and emission ranges required by these techniques.</p><p>This framework constitutes the main axis that harmonizes Turkish environmental law with the European Union’s Industrial Emissions Directive (2010/75/EU) and the Best Available Techniques / BAT-Associated Emission Level (“<b>AEL</b>”) system, which forms the backbone of said Directive. The technical and implementation-oriented dimension of this structure specific to the metal sector was prepared by the Ministry of Environment, Urbanization and Climate Change (“<b>Ministry</b>”), published in the Official Gazette dated November 30, 2025, and entered into force as of December 1, 2025, with the “<i>Communiqué on Best Available Techniques in Metal Production and Processing</i>” (“<b>Communiqué</b>”).</p><p>While the Communiqué sets forth which applications shall be accepted within the scope of BAT regarding the processes used in metal production and processing, it also determines the BAT-AEL ranges that facilities must reach in the event these techniques are applied, thereby becoming the technical reference document for the content of environmental permits, inspections, and the scoring of the Green Transformation in Industry (“<b>GTI</b>”) Certificate. Consequently, although the Communiqué may appear to be “merely a technical communiqué” at first glance, it possesses the potential to produce highly effective results regarding both the administrative sanction regime and green transition policies.</p><p>This article aims to position the Communiqué within the broader normative and political context surrounding it, rather than addressing it as a solitary text. In this context, the study will address: (i) the hierarchy of legislation upon which the Communiqué is based, (ii) the legal nature and purpose of the Communiqué, (iii) the Communiqué’s structural compliance with the EU Industrial Emissions Directive and the BAT/BAT-AEL system, and (iv) finally, the concrete obligations, risks, and compliance strategies created by the Communiqué for facilities operating in the field of metal production and processing.</p><p><b>II. NORMATIVE FRAMEWORK: THE RELATIONSHIP BETWEEN LAW, PRESIDENTIAL DECREE, REGULATION, AND COMMUNIQUÉ</b></p><p>To correctly evaluate the legal nature of the Communiqué, it is mandatory to comprehend the normative structure in which this Communiqué is situated. The following sub-headings reveal the consistent and systematic appearance of this hierarchical structure in which the Communiqué is located.</p><p><b>A. Environmental Law No. 2872: The Fundamental Legal Basis of the BAT System</b></p><p>The first fundamental regulation upon which the Communiqué is based is the Environmental Law No. 2872. Environmental Law No. 2872 grants the Ministry the authority to determine technical standards, monitor compliance with these standards, and impose administrative sanctions when necessary, for the purpose of protecting the environment and reducing industrial-sourced pollution. The legal basis for the BAT and BAT-AEL approach is constituted by this regulatory authority granted by Environmental Law No. 2872.</p><p><b>B. Presidential Decree No. 1: Institutional Authorization</b></p><p>Presidential Decree No. 1 (“<b>Decree</b>”) determines which administrative structure shall prepare and execute regulations in the field of the environment. The scope of duty of the Ministry of Environment, Urbanization and Climate Change is defined by this Decree; the authority to prepare regulations regarding emission limits, technical criteria, and sectoral standards has been conferred upon the relevant units. The institutional status of the technical units that prepared and implement the Communiqué is also based on this Decree. Therefore, the implementation and inspection capacity of the Communiqué, as well as its legal validity, are made possible through this institutional structure established by the Decree.</p><p><b>C. Regulation on the Management of Industrial Emissions (OG dated 14/01/2025): Framework Regulation</b></p><p>The Regulation on the Management of Industrial Emissions (“<b>Regulation</b>”) is the fundamental regulation that defines the legal nature of the BAT and BAT-AEL concepts in Turkish law in a clear and binding manner for the first time and classifies them as the basic criteria for environmental permits. With the Regulation, the previous fragmented permit system has been abandoned; instead, under the adopted integrated emission-based model, it is envisaged that environmental permits will now be shaped directly through BAT and BAT-AEL compliance.</p><p>The GTI Certificate system created within the same scope envisages the classification of facilities between A–F according to their BAT compliance level, and this evaluation is based directly on the technical criteria contained in the Communiqué. Finally, the Regulation establishes the necessary normative ground for the transposition of the BAT and BAT-AEL approach, which forms the backbone of the EU Industrial Emissions Directive (“<b>IED</b>”), into Turkish law; thus, ensuring that the national BAT system operates in both structural and functional harmony with the EU acquis.</p><p><b>D. Metal BAT Communiqué: Sectoral Technical Implementation of the Framework</b></p><p>Although the Communiqué is positioned as a subordinate regulatory act in the hierarchy of legal norms, it constitutes one of the most decisive elements of the system in practice. The Communiqué transforms the general provisions of the Regulation into technical and applicable rules for the metal sector, defining in detail which methods and equipment are accepted as BAT in this field.</p><p>Furthermore, the Communiqué ensures that the environmental performance of facilities is evaluated in an objective and measurable manner by setting forth the BAT-AELs targeted by the BAT application. These technical values bear the quality of a directly binding reference in determining the content of environmental permits, in establishing compliance during administrative inspections, and in the scoring within the scope of the GTI Certificate. Therefore, even though the Communiqué is located at a lower rung of the normative hierarchy, it has practically become the most effective regulatory tool at the center of both environmental compliance and sectoral inspection.</p><p><b>III. THE LEGAL NATURE AND PURPOSE OF THE COMMUNIQUÉ</b></p><p>First, the Communiqué puts the BAT concept into practice for the metal sector. Although the Regulation defines BAT as a principle, the Communiqué clarifies which process constitutes this technical level through its technical annexes. For this reason, details regarding processes, equipment, abatement technologies, and efficiency applications used in the metal sector are rendered legally binding by the Communiqué.</p><p>The second fundamental function of the Communiqué is the establishment of the BAT-AEL ranges that determine the performance levels associated with the BAT application. Since BAT-AEL defines the range in which a facility&#8217;s environmental performance must fall with numerical values, it does not merely serve as a technical indicator; on the contrary, it becomes a mandatory normative criterion used in the granting of environmental permits, the determination of compliance in inspections, and the GTI Certificate classification.</p><p>Moreover, the Communiqué develops a detailed approach specific to the production structure of the metal sector. Since processes such as smelting, casting, rolling, surface treatments, heat treatments, or coating differ significantly from one another in terms of their environmental impacts, determining the appropriate BATs for each process is not only a technical but also a legal necessity. In this context, the Communiqué clearly distinguishes the technical regulations to which all facilities operating in the sector will be subject regarding the relevant sub-processes.</p><p>Finally, the basic technical data to be used in granting environmental permits, the basis for inspections, the criteria for GTI Certificate scoring, and the reference points facilities will use when preparing their internal compliance plans are established by the Communiqué. Therefore, the Communiqué is positioned as an implementation tool that ensures administrative processes rest on a predictable and measurable foundation.</p><p><b>IV. COMPLIANCE WITH THE EU INDUSTRIAL EMISSIONS DIRECTIVE</b></p><p>Beyond being a list of technical standards prepared in line with national needs, the Communiqué also constitutes a significant part of Türkiye’s alignment process with the European Union’s IED framework. The IED constitutes the basic reference valid throughout Europe in the control of industrial-sourced environmental pollution and imposes an obligation on member states to apply BAT and BAT-AEL principles in the granting of environmental permits. The concepts of BAT and BAT-AEL in Turkish law are the direct equivalents of this approach. Therefore, although the Communiqué is a national regulation, it shows parallelism with the EU Directive in terms of content, method, and technical detail.</p><p>Compliance is not only at the conceptual dimension; the preparation method of the Communiqué has also proceeded in parallel with the “<i>BAT Conclusions</i>” format in the EU. Addressing processes specific to the metal sector individually, defining the technologies used in detail, and determining performance ranges signify the adoption of the method the EU has applied for years at the national level. This situation indicates that the Communiqué proceeds on the same technical line as the IED in terms of both content and approach.</p><p>Indeed, the GTI Certificate system developed in Türkiye follows the same direction as the EU’s green transformation policies in industry while classifying the environmental performance of facilities according to BAT values. Since the EU’s Carbon Border Adjustment Mechanism (“<b>CBAM</b>”) takes into account the environmental performance of production, it is essential for facilities compliant with BAT-AEL levels to limit potential additional tax costs in foreign trade.</p><p>In conclusion, the Communiqué is a regulation forming the technical basis of compliance with the EU Industrial Emissions Directive. The fact that it is based on BAT and BAT-AEL, which are the national equivalents of the BAT and BAT-AEL system; that it details sector-based technical requirements, establishes measurable criteria in permit processes, and constructs an evaluation structure linked to green transformation policies, makes the Communiqué the concrete and functional implementation of the EU approach in Türkiye.</p><p><b>V. OBLIGATIONS ARISING WITHIN THE SCOPE OF THE COMMUNIQUÉ FOR FACILITIES IN THE METAL SECTOR AND THE COMPLIANCE PROCESS</b></p><p>For facilities operating in the metal sector, the Communiqué does not merely bear the quality of a technical guide; it contains directly binding provisions regarding the obtaining of environmental permits, the continuation of existing permits, and the assurance of compliance in inspection processes. Therefore, the entry into force of the Communiqué necessitates facilities to re-evaluate both their existing processes and their environmental performances. The compliance process is not limited to the review of technical tools; it encompasses administrative, technical, and planning obligations spreading across the entire operation of the enterprise.</p><p>For facilities located in the Metal Sector, the first step is the comparison of the processes they conduct with the BAT levels defined in the Communiqué. This evaluation is not solely regarding the equipment or abatement technology used; raw material preferences, energy consumption, efficiency applications in the process flow, and methods aimed at reducing waste generation are addressed together within the scope of BAT. If there is a discrepancy between the BAT and the current status of the facility, the enterprise must improve its technical capacity or adapt its processes to approach the BAT level.</p><p>The complementary element of this technical compliance passes through the provision of BAT-AEL values regulated in the Communiqué. BAT-AEL numerically indicates the range in which the facility&#8217;s environmental performance must be situated and is taken as the basis for the determination of compliance in permit processes. Consequently, it is not sufficient for facilities to merely declare that they apply BAT; the results of the applied techniques must correspond to the BAT-AEL ranges. In cases where BAT-AEL cannot be met, for instance, the facility must strengthen its abatement systems, make process changes, or plan additional emission-reducing measures.</p><p>The entry into force of the Communiqué also directly affects the environmental permit processes of the facilities. Just as demonstrating compliance with BAT and BAT-AEL is mandatory in new permit applications, proving that these values are met is also required in the renewal or maintenance of existing permits. This requirement obliges enterprises to sustain their compliance with the Communiqué not only at the initial stage but throughout the entire duration of the permit.</p><p>Another dimension of the compliance process is the monitoring and reporting obligations introduced by the Communiqué. Monitoring and notifying emissions, wastewater parameters, and other environmental indicators in accordance with the methods defined in the Communiqué are mandatory for the healthy operation of both the permit processes and the inspection mechanism. This necessity compels facilities to strengthen their internal monitoring capacities and to transition to a structure that generates regular data.</p><p>The Communiqué is also critical in terms of creating an impact on investment and planning for facilities. Process improvements, additional abatement systems, the development of measurement infrastructure, or the realization of energy efficiency applications to be made to comply with the BAT level require significant financial resources. Therefore, compliance with the Communiqué will not only be an environmental necessity but an element affecting the long-term investment strategy and budget planning of the enterprise.</p><p>When this holistic framework is considered, it will be seen and understood that the Communiqué creates a multi-layered compliance process producing technical, administrative, and strategic results for facilities in the metal sector. Ensuring compliance is important not only in terms of conformity with environmental legislation but also regarding the enterprise preserving its competitive power, developing its sustainable production capacity, and transitioning to a production structure compatible with international standards.</p><p><b>VI. CONCLUSION</b></p><p>The Communiqué is one of the fundamental regulations clarifying the technical and administrative framework aimed at improving environmental performance in the metal sector. This regulation envisages a transformation regarding the entirety of production processes, going beyond the traditional environmental approach that merely targets the limitation of pollutant releases. Said regulation creates a concrete, measurable, and applicable model aimed at managing the environmental impacts of facilities at the source.</p><p>With the entry into force of the Communiqué, it is mandatory for facilities to re-evaluate their technical infrastructures, process preferences, and monitoring-reporting systems. This process is not only a legal obligation but also a step that strengthens the environmental risk management of the enterprise and supports the sustainability of long-term production capacity.</p><p>In line with Türkiye’s 2053 Net Zero Emission target, the dissemination of clean production technologies and circular economy practices in industry has become a strategic element in terms of preserving international competitive power, in addition to environmental requirements. The Communiqué ensures that environmental performance in the metal production and processing sector sits on a measurable and comparable ground by creating the technical infrastructure of this transformation. In this aspect, the regulation can be evaluated as a significant threshold regarding access to green finance, environmental compliance in exports, and integration into sustainable supply chains.</p><p>The full text of the Communiqué is available <a href="https://www.resmigazete.gov.tr/eskiler/2025/11/20251130-7.htm">here</a>.</p><p><span style="background-color: #ffffff;">Makalenin Türkçe versiyonuna ulaşmak için bu <a href="https://mcusercontent.com/9d531adc0538c6e253442bdb6/files/fb00c3f3-3e39-00fb-93a9-25886f1777fd/Metal_Met_Teblig_i_11122025.pdf">bağlantıya</a></span><span style="background-color: #ffffff;"> tıklayınız.</span></p>						</div>
				</div>
					</div>
				</div>
				<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2026/01/WhatsApp-Image-2026-01-28-at-2.18.44-PM-e1769683701708.jpeg" alt="Serhat Aydın, LL.M.">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Serhat Aydın, LL.M.</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Managing Partner</div>
			
			
							<div class="wpr-member-description">+90 532 242 10 28
<br>
serhat.aydin@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/02/AYDIN-LAW-07-scaled-e1771836405980.jpg" alt="Necip Çiftçi">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Necip Çiftçi</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 538 775 67 94<br>
necip.ciftci@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2025/12/11/the-position-of-the-communique-on-best-available-techniques-in-metal-production-and-processing-within-turkish-environmental-legislation-and-its-compliance-with-the-eu-industrial-emissions-directive/">IBAT Communiqué For The Metal Industry: Position In Turkish Environmental Law &#038; Alignment With The EU IED</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A New Era In Türkiye’s Green Transition: Draft Regulation On The Operation Of The ETS Market Has Been Published!</title>
		<link>https://www.aydin.law/2025/11/04/a-new-era-in-turkiyes-green-transition-draft-regulation-on-the-operation-of-the-ets-market-has-been-published/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Tue, 04 Nov 2025 06:32:58 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13437</guid>

					<description><![CDATA[<p>I. INTRODUCTION With the enactment of the Climate Law No. 7552, the legal foundation for a market mechanism based on emission trading has been established in Türkiye. On 23/10/2025, the Energy Market Regulatory Authority of the Republic of Türkiye (the “EMRA”), acting under the Electricity...</p>
<p><a href="https://www.aydin.law/2025/11/04/a-new-era-in-turkiyes-green-transition-draft-regulation-on-the-operation-of-the-ets-market-has-been-published/">A New Era In Türkiye’s Green Transition: Draft Regulation On The Operation Of The ETS Market Has Been Published!</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13437" class="elementor elementor-13437">
				<div class="elementor-element elementor-element-6b033ae e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no e-con e-parent" data-id="6b033ae" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-95fde68 elementor-widget elementor-widget-text-editor" data-id="95fde68" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p data-start="140" data-end="1173"><strong data-start="140" data-end="156">I. INTRODUCTION</strong></p>
<p data-start="140" data-end="1173">With the enactment of the Climate Law No. 7552, the legal foundation for a market mechanism based on emission trading has been established in Türkiye. On 23/10/2025, the Energy Market Regulatory Authority of the Republic of Türkiye (the “<b>EMRA</b>”), acting under the Electricity Market Law No. 6446, published for public consultation the Draft Regulation on the Operation of the Emission Trading System Market (the “<b>Draft Regulation</b>”). The Draft Regulation sets out the procedures and principles for establishing and operating the Emission Trading System (the “<b>ETS</b>”) market and the Transaction Registry System (the “<b>TRS</b>”), which aims to encourage the reduction of greenhouse gas emissions. To achieve this purpose, the Draft Regulation outlines the ETS framework in which allowances, defined as fungible, transferable, dematerialized rights representing the authorization to emit one ton of carbon dioxide equivalent of greenhouse gases within a specified period, are allocated, purchased, and sold (the “<b>Allowance</b>”).</p>
<p data-start="1175" data-end="1700">Accordingly, Türkiye is establishing the institutional and legal foundations of a framework parallel to the European Union Emission Trading System, which was introduced by Directive 2003/87/EC and has evolved over time, particularly through the Carbon Border Adjustment Mechanism (the “<b>CBAM</b>”), thereby defining its scope and influence more clearly. In this regard, interested parties will be able to share their opinions and suggestions regarding the Draft Regulation with EMRA by the end of the business day on 13/11/2025.</p>
<p data-start="1702" data-end="1730"><strong data-start="1702" data-end="1728">II. FUNDAMENTAL PRINCIPLES</strong></p>
<p data-start="1732" data-end="2053"><strong data-start="1732" data-end="1765">1. What Are the Market Types?</strong><br data-start="1765" data-end="1768">Under the Draft Regulation, the markets within the scope of the ETS are divided into two types: the primary market and the secondary market. In these markets, purchase and sale of Allowances and/or other standardized contracts deemed appropriate for emission trading are carried out.</p>
<p data-start="2055" data-end="2421">In the primary market, Allowances are distributed among market participants through auctioning. The secondary markets are the markets where the purchase and sale transactions of Allowances that have been freely allocated and/or sold in the primary market are carried out. The secondary markets consist of the spot Allowance market and the futures Allowance market.</p>
<p data-start="2423" data-end="2724"><strong data-start="2423" data-end="2457">2. Who Is the Market Operator?</strong></p>
<p data-start="2423" data-end="2724">The primary and secondary ETS markets are organized and operated by Enerji Piyasaları İşletme Anonim Şirketi (the “<b>Market Operator</b>” or “<b>EPİAŞ</b>”). In these markets, EPİAŞ acts as the central counterparty, assuming the role of seller to buyers and buyer to sellers.</p>
<p data-start="2726" data-end="3089">In addition, the Market Operator carries out settlement management; accrual, collection, and payment of invoices arising from settlement results; data publication activities; and the operation of the TRS. These functions are performed on an equal basis, without discrimination between parties, and in line with the principles of transparency and accountability.</p>
<p data-start="3091" data-end="3828"><strong data-start="3091" data-end="3149">3. Who Falls Within the Scope of the Draft Regulation?</strong></p>
<p data-start="3091" data-end="3828">Persons who complete the participation procedures set out in the Draft Regulation may become market participants (the “<b>Market Participant</b>”). For this purpose, the relevant entities are the operators covered by the ETS. An operator refers to the responsible natural or legal persons, as well as public institutions and organizations, that carry out the activities listed in Annex-1 of the Draft Türkiye Emissions Trading System Regulation, published on 22/07/2025 on the website of the Ministry of Environment, Urbanization and Climate Change, Climate Change Presidency (the “<b>Presidency</b>”), or that operate and have the right to use the relevant installation (the “<b>Operator</b>”).</p>
<p data-start="3830" data-end="4102">To obtain “<b>Market Participant</b>” status, Operators must execute a TRS participation agreement with the Market Operator. Opening an account in the TRS is mandatory under the ETS. Application and registration processes are completed through the ETS Market Management System.</p>
<p data-start="4104" data-end="4504"><strong data-start="4104" data-end="4174">4. What Are the Principles Governing Supply in the Primary Market?</strong></p>
<p data-start="4104" data-end="4504">The quantity of Allowances offered for sale through auctions will be determined annually by the Presidency, in accordance with the auction schedule to be published by the Presidency, and will be distributed equally among the auctions to be held throughout the year. The primary market will be operated by the Market Operator.</p>
<p data-start="4506" data-end="5136">As stated in our article “Roadmap for Green Transition: Draft Regulation on Emission Trading System Has Been Published” (the “<b>Article</b>”) (You can access the full text of the Article via this&nbsp;<a href="https://www.aydin.law/2024/09/09/roadmap-for-green-transition-draft-regulation-on-emission-trading-system-has-been-published/" target="_blank" rel="noopener">link.</a>), in previous auctions each 1 lot purchase bid corresponded to 500 Allowances. Under the Draft Regulation, the minimum bid size has been maintained at 1 lot, while each 1 lot purchase bid in the primary market will now correspond to 100 Allowances. Each Allowance represents the right to emit 1 ton of carbon dioxide equivalent of greenhouse gases. Prices in the bids will be quoted in Turkish lira per tCO₂e, in multiples of TRY 1.</p>
<p data-start="5138" data-end="5297">In auctions conducted under these principles, the Market Operator acts as the “<i>sole seller</i>,” while Market Participants are only permitted to submit buy bids.</p>
<p data-start="5299" data-end="5546"><strong data-start="5299" data-end="5345">5. How Is the Auction Schedule Determined?</strong></p>
<p data-start="5299" data-end="5546">The auction schedule includes the auction date, the start and end times of the sessions during which bids will be submitted, the quantity of Allowances to be auctioned, and other relevant details.</p>
<p data-start="5548" data-end="6199">Within 15 (<i>fifteen</i>) business days following the publication of the National Allocation Plan, the auction schedule will be published by the Presidency. If the total bids submitted are less than the number of Allowances offered for auction, the auction will be cancelled, and the cancelled Allowances will be equally distributed among the remaining auctions scheduled for the same system year. If the last auction of the year is cancelled, it may be repeated under the same conditions up to two times within 15 (<i>fifteen</i>) business days. If the second repetition is also cancelled, the relevant Allowances will be auctioned in the following system year.</p>
<p data-start="6201" data-end="6577"><strong data-start="6201" data-end="6279">6. What Are the Principles Governing Transactions in the Secondary Market?</strong></p>
<p data-start="6201" data-end="6577">The secondary markets operate through a continuous trading mechanism in which Market Participants may carry out buy and/or sell transactions based on the Allowances held in their TRS accounts. Unlike the primary market, participants in the secondary market may submit both buy and sell orders.</p>
<p data-start="6579" data-end="7490">• In the spot Allowance market, contracts are opened for trading by the Market Operator, and upon price matching, the parties assume the obligation to deliver or receive the corresponding quantity of Allowances. Market Participants may submit sell orders up to the total quantity of Allowances eligible for trading in their TRS accounts combined with the quantity purchased within the same trading session. The minimum bid size for purchase or sale orders in these markets has been set at 1 lot. As stated in our Article, each 1 lot order previously corresponded to 1,000 Allowances, whereas under the Draft Regulation, each 1 lot now corresponds to 100 Allowances. Each Allowance represents the right to emit 1 ton of carbon dioxide equivalent (tCO₂e) of greenhouse gases. Prices are quoted in TRY per tCO₂e in multiples of TRY 0.50, and quantities are specified in terms of the number of Allowances per lot.</p>
<p data-start="7492" data-end="7679">• The futures Allowance market will be established and operated in accordance with the procedures and principles to be determined by the EMRA, considering the opinion of the Presidency.</p>
<p data-start="7681" data-end="8208"><strong data-start="7681" data-end="7737">7. Why Does a Market Participant Provide Collateral?</strong></p>
<p data-start="7681" data-end="8208">The Draft Regulation introduces a requirement for Market Participants to provide collateral in order to ensure financial stability in the emissions trading market and minimize collection risks. Collateral serves to:<br data-start="7955" data-end="7958">• ensure the continuity of cash flow among participants when a Market Participant fails to meet market-related obligations or cannot perform its activities,<br data-start="8114" data-end="8117">• secure the creditor Market Participant if a participant does not make payments on time.</p>
<p data-start="8210" data-end="8304">Participants with insufficient collateral cannot submit bids in the relevant market session.</p>
<p data-start="8306" data-end="8704"><strong data-start="8306" data-end="8320">III. CONCLUSION</strong></p>
<p data-start="8306" data-end="8704">As the financial implications of the Carbon Border Adjustment Mechanism (the “<b>CBAM</b>”), which envisages a transitional period until 31/12/2025 and will fully enter into force on 1/1/2026, draw nearer and are expected to significantly affect Türkiye’s export-oriented economy, the step taken by Türkiye to establish an ETS under the Green Deal Action Plan is of critical importance.</p>
<p data-start="8706" data-end="8767">The full text of the Draft Regulation can be accessed&nbsp;<a href="https://epdk.gov.tr/Detay/Icerik/4-16207/emisyon-ticaret-sistemi-piyasasinin-isletilmesine" target="_blank" rel="noopener">here</a>.</p>
<p data-start="8706" data-end="8767"><span style="background-color: #ffffff;">Makalenin Türkçe versiyonuna ulaşmak için bu <a href="http://www.aydin.law/wp-content/uploads/2025/11/04112025_TR_MAKALE.pdf">bağlantıya</a></span><span style="background-color: #ffffff;">&nbsp;tıklayınız.</span></p>						</div>
				</div>
					</div>
				</div>
				<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-10-12-47-24-e1741603819818.jpg" alt="Aleyna Altın">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Aleyna Altın</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Legal Intern</div>
			
			
							<div class="wpr-member-description">+90  533 918 83 83
<br>
aleyna.altin@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2025/11/04/a-new-era-in-turkiyes-green-transition-draft-regulation-on-the-operation-of-the-ets-market-has-been-published/">A New Era In Türkiye’s Green Transition: Draft Regulation On The Operation Of The ETS Market Has Been Published!</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Use Of Immovable Property In Solar And Biomass Energy-Based Investments: The Latest Regulation Of EMRA</title>
		<link>https://www.aydin.law/2025/10/30/use-of-immovable-property-in-solar-and-biomass-energy-based-investments-the-latest-regulation-of-emra/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Thu, 30 Oct 2025 11:58:29 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13337</guid>

					<description><![CDATA[<p>I. INTRODUCTION In the present day, where the energy transition is gaining momentum, one of the primary objectives of Türkiye&#8217;s energy policies is to increase investments in generation based on renewable resources and to make these investments more accessible. In this regard, the Energy Market...</p>
<p><a href="https://www.aydin.law/2025/10/30/use-of-immovable-property-in-solar-and-biomass-energy-based-investments-the-latest-regulation-of-emra/">Use Of Immovable Property In Solar And Biomass Energy-Based Investments: The Latest Regulation Of EMRA</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13337" class="elementor elementor-13337">
				<div class="elementor-element elementor-element-e7c0705 e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no e-con e-parent" data-id="e7c0705" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-3c15df1 elementor-widget elementor-widget-text-editor" data-id="3c15df1" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p data-start="276" data-end="292"><strong data-start="276" data-end="292">I. INTRODUCTION</strong></p><p data-start="294" data-end="767">In the present day, where the energy transition is gaining momentum, one of the primary objectives of Türkiye&#8217;s energy policies is to increase investments in generation based on renewable resources and to make these investments more accessible. In this regard, the Energy Market Regulatory Authority of the Republic of Türkiye (“<b>EMRA</b>”) continues its regulatory activities aimed at strengthening sustainability, competitiveness, and investor confidence in the energy sector.</p><p data-start="769" data-end="1237">With the Board Decision No. 13885 (the “<b>Decision</b>”), published by EMRA in the Official Gazette dated 28/10/2025 and numbered 33061, an amendment was made to clause (a) of Article 10 of the List of Information and Documents Required to be Submitted in the License Application, which is included in Annex-4 of the Board Decision No. 13130-2 dated 26/12/2024 concerning the Procedures and Principles Regarding Applications for Preliminary License and License Transactions.</p><p data-start="1239" data-end="1265"><strong data-start="1239" data-end="1265">II. FUNDAMENTAL PRINCIPLES</strong></p><p data-start="1267" data-end="1432"><strong data-start="1267" data-end="1432">1. Under Which Principles Does the Decision Set Out the Procedures Concerning the Site of the Generation Facility to Be Completed During the Pre-Licensing Stage?</strong></p><p data-start="1434" data-end="1976">The Decision regulates the procedures to be followed regarding the documentation of works and transactions that must be completed during the pre-licensing period in relation to the site where the generation facility will be established. Accordingly, (i) if the site is owned by the legal entity holding the pre-license, the title deed must be submitted; and (ii) if the site is not owned by the pre-license holder, the procedures for obtaining ownership or usage rights over the land where the facility will be constructed are to be followed.</p><p data-start="1978" data-end="2355">This regulation, which was already in practice before the Decision entered into force, aims for investors to clarify the legal status of the site where the generation facility will be established during the preliminary license process. Thus, it is aimed at preventing potential uncertainties regarding the ownership or right of use from being carried over to the license stage.</p><p data-start="2357" data-end="2708">The obligations and documents set forth in the relevant clause of the article forming the basis of the Decision shall be applied by taking into account the aforementioned distinction of ownership; it will be ensured that applications with different ownership statuses are evaluated within the framework of the procedures stipulated in the legislation.</p><p data-start="2710" data-end="2805"><strong data-start="2710" data-end="2805">2. What is the Procedure to be Followed for Applications Based on Solar and Biomass Energy?</strong></p><p data-start="2807" data-end="3132">It is required that privately owned immovable properties be registered in the name of the Treasury pursuant to Expropriation Law No. 2942, or that urgent expropriation decisions be obtained from the competent courts, and that the payment receipts evidencing that the relevant compensation amounts have been paid be submitted.</p><p data-start="3134" data-end="3441">For applications based on solar and biomass energy, if the procedure above for privately owned immovable properties is not preferred, it has been regulated that the following procedure must be followed, provided that it is not less than 10 (<i>ten</i>) years and is compatible with the generation license duration:</p><p data-start="3443" data-end="3570">• The establishment of a usufruct right, or<br data-start="3486" data-end="3489" />• The execution of a lease agreement, provided it is annotated to the title deed.</p><p data-start="3572" data-end="3812">Therefore, with the Decision, it is envisaged that the legal status concerning the ownership or right of use of the immovable property shall be structured in a manner that ensures its validity and continuity throughout the license duration.</p><p data-start="3814" data-end="3828"><strong data-start="3814" data-end="3828">III. CONCLUSION</strong></p><p data-start="3830" data-end="4434">The Decision clarifies the current practice regarding the immovable properties where the generation facility will be established in renewable energy investments, allowing investors to secure the right of use through different legal means. Within this scope, the amendment has established an alternative legal framework by eliminating the obligation to apply expropriation and urgent expropriation procedures in solar and biomass-based projects. In this way, the right to private ownership has been preserved, while sustainable and predictable investment processes in the energy market have been promoted.</p><p data-start="4436" data-end="4478">You can access the Decision via this <a href="https://www.resmigazete.gov.tr/eskiler/2025/10/20251028-5.pdf">link</a>.</p><p data-start="4436" data-end="4478">Makalenin Türkçe versiyonuna ulaşmak için bu <a href="http://www.aydin.law/wp-content/uploads/2025/10/Gunes-ve-Biyokutle-Enerjisine-Dayali-Yatirimlarda-Tasinmaz-Kullanimi-EPDKnin-Son-Duzenlemesi.pdf">bağlantıya</a> tıklayınız.</p>						</div>
				</div>
					</div>
				</div>
				<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="http://www.aydin.law/wp-content/uploads/2025/10/WhatsApp-Image-2025-10-09-at-1.15.02-PM-e1760005142973.jpeg" alt="Sinem Sedef">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Sinem Sedef</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Legal Intern</div>
			
			
							<div class="wpr-member-description">+90  538 343 30 11
<br>
sinem.sedef@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2025/10/30/use-of-immovable-property-in-solar-and-biomass-energy-based-investments-the-latest-regulation-of-emra/">Use Of Immovable Property In Solar And Biomass Energy-Based Investments: The Latest Regulation Of EMRA</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Transparency, Balance, And Competition In Energy Markets And Environmental Markets: An Evaluation Of EMRA’s Draft Regulation</title>
		<link>https://www.aydin.law/2025/10/24/transparency-balance-and-competition-in-energy-markets-and-environmental-markets-an-evaluation-of-emras-draft-regulation/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Fri, 24 Oct 2025 09:02:48 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13316</guid>

					<description><![CDATA[<p>I. INTRODUCTION Today, as the energy sector holds a strategic position in terms of economic growth, security of supply, and sustainable development, ensuring transparency in market operations is of critical importance for both increasing investor confidence and establishing a sustainable competitive environment. In this context,...</p>
<p><a href="https://www.aydin.law/2025/10/24/transparency-balance-and-competition-in-energy-markets-and-environmental-markets-an-evaluation-of-emras-draft-regulation/">Transparency, Balance, And Competition In Energy Markets And Environmental Markets: An Evaluation Of EMRA’s Draft Regulation</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13316" class="elementor elementor-13316">
				<div class="elementor-element elementor-element-da18948 e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no e-con e-parent" data-id="da18948" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-921c5b1 elementor-widget elementor-widget-text-editor" data-id="921c5b1" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p data-start="227" data-end="245"><strong>I. INTRODUCTION</strong></p><p data-start="227" data-end="245">Today, as the energy sector holds a strategic position in terms of economic growth, security of supply, and sustainable development, ensuring transparency in market operations is of critical importance for both increasing investor confidence and establishing a sustainable competitive environment.</p><p data-start="227" data-end="245">In this context, Enerji Piyasaları İşletme Anonim Şirketi (“<strong>EPİAŞ</strong>”), which undertakes a central role in the processes for the transparent, predictable, and effective operation of energy markets, strengthens the institutional structure of Türkiye&#8217;s energy markets through the regular sharing of market data and the prevention of information asymmetry.</p><p data-start="902" data-end="1229">The Republic of Turkey Energy Market Regulatory Authority (“<strong>EMRA</strong>”) has submitted the Draft Regulation on Transparency and Market Abuse in Energy Markets and Environmental Markets (the “<strong>Draft Regulation</strong>”), which it prepared to ensure the transparent and reliable conduct of market activities, for public opinion on 14/10/2025.</p><p data-start="1231" data-end="1664">EMRA adopts a participatory approach in its regulatory processes by taking into account the opinions and suggestions of market participants and other relevant parties; it places importance on stakeholder cooperation for the healthy development of the sector. In this regard, interested parties will be able to share their opinions and suggestions regarding the Draft Regulation with EMRA by the end of the business day on 31/10/2025.</p><p data-start="1671" data-end="1700"><strong>II. FUNDAMENTAL PRINCIPLES</strong></p><p data-start="1702" data-end="1781"><strong>1. Which Bilateral Agreements Are Within the Scope of the Draft Regulation?</strong></p><p data-start="1783" data-end="2210">In the context of the Draft Regulation, bilateral agreements are contracts concluded among market participants, who are persons authorized to trade on their own behalf and for their own account in energy markets and environmental markets, including aggregators, balancing responsible parties, and transmission and distribution system operators, regarding the trade of products in the energy markets and environmental markets.</p><p data-start="2212" data-end="2618">The Draft Regulation regulates matters related to the futures electricity market, the day-ahead market, the balancing power market, the ancillary services market, the futures natural gas market, the spot natural gas market, the emission trading system market, the organized renewable energy resource guarantee market, and the bilateral agreements made for the purpose of wholesale trade in these markets.</p><p data-start="2620" data-end="2828">On the other hand, contracts traded in the futures and options market operated by Borsa İstanbul Anonim Şirketi and bilateral agreements concluded with consumers are outside the scope of the Draft Regulation.</p><p data-start="2835" data-end="2963"><strong>2. According to the Draft Regulation, How Will Transparency in Energy Markets and Environmental Markets Be Ensured by EPİAŞ?</strong></p><p data-start="2965" data-end="3218">According to the Draft Regulation, two different platforms, under the names of the Inside Information Platform and the Transparency Platform, will be operated by EPİAŞ for the purpose of ensuring transparency in energy markets and environmental markets:</p><p data-start="3220" data-end="3572"><strong data-start="3220" data-end="3251">Inside Information Platform;</strong> is the central data platform that will be operated for the purpose of (i) the public disclosure of inside information in energy markets and environmental markets, (ii) market participants carrying out their market activities within the framework of equal opportunity, and (iii) the prevention of information asymmetry.</p><p data-start="3574" data-end="3607">Pursuant to the Draft Regulation:</p><p data-start="3610" data-end="3691"><strong data-start="3439" data-end="3459">• </strong>Information that must be publicly disclosed pursuant to the relevant legislation,</p><p data-start="3694" data-end="3913"><strong data-start="3439" data-end="3459">• </strong>Information related to the production, storage, consumption, and transmission capacity and utilization of facilities, including the planned or unplanned unavailability of facilities belonging to market participants, and</p><p data-start="3916" data-end="4147"><strong data-start="3439" data-end="3459">• </strong>Other information likely to be used by a prudent market participant as part of the basis for a decision to enter into a transaction or to submit a bid concerning an energy and environmental product, qualifies as inside information.</p><p data-start="4149" data-end="4365"><strong data-start="4149" data-end="4174">Transparency Platform;</strong> is the central data platform where data such as price, volume, etc., remain outside of data qualifying as inside information in energy markets and environmental markets, will be published.</p><p data-start="4367" data-end="4628">The data to be published will be procured by EPİAŞ from the organizations holding the data, based on the Draft Regulation. EPİAŞ is authorized to make protocols to procure data from institutions and organizations that are not market participants. Provided that:</p><p data-start="4631" data-end="4668"><strong data-start="3439" data-end="3459">• </strong>(i) data qualifying as trade secrets,</p><p data-start="4671" data-end="4729"><strong data-start="3439" data-end="3459">• </strong>(ii) data that reveal the identity of market participants,</p><p data-start="4732" data-end="4886"><strong data-start="3439" data-end="3459">• </strong>(iii) data of a nature that would lead to concerted practices or joint action within the framework of the Law on the Protection of Competition No. 4054,</p><p data-start="4888" data-end="4937">cannot be published on the Transparency Platform.</p><p data-start="4944" data-end="5026"><strong>3. According to the Draft Regulation, What Constitutes Market Abusive Conduct?</strong></p><p data-start="5028" data-end="5108">Market abusive conduct is addressed in three categories in the Draft Regulation:</p><p data-start="5110" data-end="5394"><strong data-start="5110" data-end="5173">Violation of the Obligation to Disclose Inside Information:</strong> It is the violation of the obligation to disclose data qualifying as inside information, and the changes that will occur in the data, completely and accurately, in accordance with the specified format, and without delay.</p><p data-start="5396" data-end="5877"><strong data-start="5396" data-end="5416">Insider Dealing:</strong> Persons who possess inside information in energy markets and environmental markets acquiring or disposing of an energy or environmental product by using that information through means such as submitting bids or executing transactions, and making attempts in this direction; disclosing inside information to third parties where not required; giving recommendations based on inside information for the acquisition or disposal of energy or environmental products.</p><p data-start="5879" data-end="6635"><strong data-start="5879" data-end="5903">Market Manipulation:</strong> Attempts such as submitting bids, executing transactions, modifying, or cancelling existing bids in a manner that gives or is likely to give false or misleading signals regarding the supply of, demand for, or price of products related to energy or environmental products; in a manner that secures or is likely to secure the prices of products at artificial levels without legitimate reason; by employing a fictitious device or any other form of deception or contrivance, in a manner that gives or is likely to give false or misleading signals regarding the supply of, demand for, or price of products; or in a manner that will be to the detriment of the market or market participants by means of abusing the market or market rules.</p><p data-start="6642" data-end="6699"><strong>4. What Are the Sanctions for Market Abusive Conduct?</strong></p><p data-start="6701" data-end="6789">Pursuant to Article 13 of the Draft Regulation, an administrative fine shall be imposed:</p><p data-start="6792" data-end="6913"><strong data-start="3439" data-end="3459">• </strong>(i) of up to two million Turkish liras on the market participant who violates the obligation to share inside information;</p><p data-start="6916" data-end="7089"><strong data-start="3439" data-end="3459">• </strong>(ii) in the event of insider dealing, of up to twenty million Turkish liras if the violator is a market participant, and up to two million Turkish liras if a natural person;</p><p data-start="7092" data-end="7270"><strong data-start="3439" data-end="3459">• </strong>(iii) in the event of market manipulation, of up to twenty million Turkish liras if the violator is a market participant, and up to two million Turkish liras if a natural person.</p><p data-start="7272" data-end="7568">When determining the amount of the administrative fine, criteria such as the gravity and degree of the violation, the degree of fault, the impact of the violation on the market and market prices, unjust enrichment, damage, repetition, and cooperation with EMRA will be taken into consideration.</p><p data-start="7570" data-end="7736">The sanction decisions of the Energy Market Regulatory Board within the scope of the Draft Regulation will be published in the Official Gazette and on EMRA&#8217;s website.</p><p data-start="7743" data-end="7833"><strong>5. What Are the Responsibilities of Market Participants and Market &amp; System Operators?</strong></p><p data-start="7835" data-end="8368">Market participants are obligated to identify, process, preserve, and effectively disclose inside information on the Inside Information Platform within the scope of the Draft Regulation; to notify EPİAŞ of the persons authorized to transact on the Inside Information Platform; to report market abusive conduct or suspicious situations to EMRA; to submit the information and documents requested by EMRA for the purpose of investigating market abusive conduct or market surveillance; and to ensure their confidentiality when necessary.</p><p data-start="8370" data-end="8825">On the other hand, EPİAŞ, Türkiye Elektrik İletim Anonim Şirketi, and Boru Hatları ile Petrol Taşıma Anonim Şirketi are obligated primarily to ensure that transactions occurring in the markets they operate are conducted in a reliable, transparent, effective, stable, fair, honest, and competitive manner; to establish a market surveillance unit for the purpose of detecting violations; to employ personnel, and to establish their own surveillance systems.</p><p data-start="8832" data-end="8850"><strong>III. CONCLUSION</strong></p><p data-start="8852" data-end="9088">The Draft Regulation, prepared based on the Electricity Market Law No. 6446, presents a comprehensive framework for the purpose of strengthening transparency and protecting market integrity in energy markets and environmental markets.</p><p data-start="9090" data-end="9385">The Draft Regulation envisages the operation of two central structures, namely the Inside Information Platform and the Transparency Platform, to ensure equal access to information and to prevent insider dealing, thereby ensuring the institutionalization of market surveillance and supervision.</p><p data-start="9387" data-end="9900">The Draft Regulation, with innovations such as the &#8220;<em>prudent market participant</em>&#8221; concept, defines behavioral standards specific to energy law, while at the same time creating a special regulatory area complementary to the general provisions of the Law on the Protection of Competition No. 4054. In this respect, the Draft Regulation constitutes an important step in terms of ensuring the fair conduct of competition in energy markets, preventing market manipulation, and establishing a reliable market structure.</p><p data-start="9902" data-end="9973">You can access the Draft Regulation and the Opinion Form via this <a href="https://www.epdk.gov.tr/Detay/Icerik/4-16195/enerji-piyasalarinda-ve-cevresel-piyasalarda-seff">link</a>.</p><p data-start="9902" data-end="9973"><span style="background-color: #ffffff;">Makalenin Türkçe versiyonuna ulaşmak için bu <a href="http://www.aydin.law/wp-content/uploads/2025/10/Enerji-Piyasalari-ve-Cevresel-Piyasalarda-Seffaflik-Denge-ve-Rekabet.pdf">bağlantıya</a></span><span style="background-color: #ffffff;"> tıklayınız. </span></p>						</div>
				</div>
					</div>
				</div>
				<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="http://www.aydin.law/wp-content/uploads/2025/02/sinem-photo-e1746715875552.jpeg" alt="Sinem Sedef">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Sinem Sedef</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Legal Intern</div>
			
			
							<div class="wpr-member-description">+90  538 343 30 11
<br>
sinem.sedef@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2025/10/24/transparency-balance-and-competition-in-energy-markets-and-environmental-markets-an-evaluation-of-emras-draft-regulation/">Transparency, Balance, And Competition In Energy Markets And Environmental Markets: An Evaluation Of EMRA’s Draft Regulation</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Restructuring Of Technical And Legal Processes In Applications For Electricity Generation Using Wind Resources</title>
		<link>https://www.aydin.law/2025/10/21/restructuring-of-technical-and-legal-processes-in-applications-for-electricity-generation-using-wind-resources/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Tue, 21 Oct 2025 10:22:57 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13307</guid>

					<description><![CDATA[<p>I. INTRODUCTION The Regulation on the Technical Evaluation of Applications for Electricity Generation Based on Wind Resources (the “Regulation”) was published in the Official Gazette dated October 20, 2015, and numbered 29508, and entered into force thereafter. The Regulation sets forth how technical evaluations shall...</p>
<p><a href="https://www.aydin.law/2025/10/21/restructuring-of-technical-and-legal-processes-in-applications-for-electricity-generation-using-wind-resources/">Restructuring Of Technical And Legal Processes In Applications For Electricity Generation Using Wind Resources</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13307" class="elementor elementor-13307">
				<div class="elementor-element elementor-element-95692c2 e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no e-con e-parent" data-id="95692c2" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-f7c6ce2 elementor-widget elementor-widget-text-editor" data-id="f7c6ce2" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p data-start="231" data-end="248"><strong>I. INTRODUCTION</strong></p><p data-start="250" data-end="798">The Regulation on the Technical Evaluation of Applications for Electricity Generation Based on Wind Resources (the “<strong>Regulation</strong>”) was published in the Official Gazette dated October 20, 2015, and numbered 29508, and entered into force thereafter. The Regulation sets forth how technical evaluations shall be conducted in the application processes for electricity generation facilities based on wind energy, the methods and criteria for determining power plant sites, and the technical and administrative coordination among the relevant institutions.</p><p data-start="800" data-end="1516">With the Regulation Amending the Regulation on the Technical Evaluation of Applications for Electricity Generation Based on Wind Resources (the “<strong>Amendment Regulation</strong>”), published in the Official Gazette dated October 1, 2025, and numbered 33034, comprehensive amendments have been introduced to the existing Regulation. These amendments cover areas such as pre-license and generation license processes, determination of connection regions, technical evaluation criteria, methods for determining power plant sites, and the assessment of unlicensed generation applications. The amendments aim to render the technical processes more transparent and auditable for the administration, investors, and grid operators alike.</p><p data-start="1518" data-end="2225">The new provisions introduced by the Amendment Regulation have significantly eliminated uncertainties regarding technical issues that have long been the subject of debate in practice, such as the application of safety buffer zones, determination of power plant site boundaries, designation of connection regions, and control mechanisms concerning amendment applications. Moreover, the restructuring of the supervision responsibility for notarized consent letters, the simplification of processes concerning the operation of the technical evaluation report, and the definition of data entry methods compatible with digital systems have strengthened the administrative functioning mechanism of the Regulation.</p><p data-start="2227" data-end="2255"><strong>II. FUNDAMENTAL PRINCIPLES</strong></p><p data-start="2257" data-end="2401"><strong>1. What are the Regulations Introduced by the Amendment Regulation Regarding the Safety Buffer Zone for Pre-Licenses and Generation Licenses?</strong></p><p data-start="2403" data-end="2683">With the Amendment Regulation, a coordinate-centered and project-boundary-focused approach has come to the forefront in the processes related to pre-licenses and generation licenses, and the concept of the “<em>safety buffer zone</em>” has been removed as a technical evaluation criterion.</p><p data-start="2685" data-end="3498">According to the new regulation, the area defined by the rotor blade diameter, taking the installation point of the wind turbines as the center, as well as the electricity storage facility, if any, must be located within the boundaries of the power plant site registered in the pre-license or generation license. However, the unit coordinates and storage facilities must be located within the boundaries of the power plant site, thereby preventing turbines from extending beyond the licensed area. In amendment applications submitted for modifying the power plant site, whether intersecting with or independent from the existing boundaries, it is essential that the turbines do not have any impact on the turbines in neighboring sites; or, in cases where such an impact exists, notarized consent must be obtained.</p><p data-start="3500" data-end="3973">As a consequence of this amendment, the concept of the safety buffer zone has not been entirely removed from the legislation; it has merely ceased to be a binding factor in the technical suitability assessment. The requirement that turbine placement be confined within the licensed site boundaries remains in force, while issues such as site overlaps, turbine interactions, and consent procedures shall continue to be examined separately under other applicable regulations.</p><p data-start="3975" data-end="4087"><strong>2. How Is the Connection Region Determined for a Pre-License Application Entering the Connection Competition?</strong></p><p data-start="4089" data-end="4485">Pursuant to the Amendment Regulation, the principle has been introduced that “the connection region in which a pre-license application will participate in the connection competition shall be determined within the framework of the relevant legislation,” thereby removing the determination of the connection region from being based solely on criteria such as surface area or the number of turbines.</p><p data-start="4487" data-end="5189">Under the Electricity Market Law No. 6446 (the “<strong>Law</strong>”), in the event that there is more than one application to connect to the same connection point or region, a competition is organized by the Türkiye Elektrik İletim Anonim Şirketi (“<strong>TEİAŞ</strong>”) under the Law No. 5346 on the Utilization of Renewable Energy Resources for the Purpose of Electricity Generation in order to determine as many applications as the announced capacity. These competitions are conducted on the basis of the lowest bid over the prices listed in Schedule (I) annexed to the Law, and the procedures and principles are regulated by a regulation issued by the Energy Market Regulatory Authority (the “<strong>EMRA</strong>”) upon the proposal of TEİAŞ.</p><p data-start="5191" data-end="5752">Within this framework, in competitions other than renewable energy resource areas (the “<strong>RERA</strong>”), connection regions are determined in line with the connectable generation capacity and regional announcements announced by TEİAŞ, whereas in RERA competitions the region and capacity are determined in the announcements or specifications of the Republic of Türkiye Ministry of Energy (the “<strong>Ministry</strong>”) and Natural Resources. As higher-tier legal norms, the Law and presidential decrees delineate the scope of authority of EMRA, TEİAŞ and the Ministry in this process.</p><p data-start="5754" data-end="5826"><strong>3. Which Amendment Applications Must Be Checked by the Grid Operator?</strong></p><p data-start="5828" data-end="6416">Notarized letters of consent submitted by natural or legal persons who have been issued a connection invitation letter for the purpose of conducting unlicensed generation activities must be verified by the relevant grid operator and subsequently submitted to the General Directorate of Energy Affairs (the “<strong>General Directorate</strong>”). With this regulation, responsibility for the document control and verification process previously under the sole authority of EMRA is also assigned to grid operators for unlicensed generation activities, thereby strengthening the on-site oversight mechanism.</p><p data-start="6418" data-end="7417">The control obligation of grid operators encompasses both formal and technical aspects. Within the scope of the formal inspection, the validity of the notarized letter of consent must be verified; the identities and authorities of persons authorized to represent and legally bind the entity must be confirmed through commercial registry certificates or notarized powers of attorney; and the presence of the originals or duly certified copies of signature declarations and registry certificates must be examined. On the technical inspection side, the assessment includes verifying the compatibility of the unlicensed generation facility’s location, capacity, and grid connection conditions with the existing system, as well as evaluating possible site overlaps and turbine interactions. Within this framework, grid operators are positioned as the primary control and supervision authority for unlicensed generation projects and enhancing the predictability and efficiency of administrative processes.</p><p data-start="7419" data-end="7700"><strong>4. What Are the Changes Made by the Amendment Regulation in the Evaluation Processes for Amendment Requests under the Regulation on Unlicensed Electricity Generation in the Electricity Market (the “RUG”), Published in the Official Gazette dated May 12, 2019, and numbered 30772?</strong></p><p data-start="7702" data-end="8486">With the Amendment Regulation, the procedures and principles regarding the technical evaluation of amendment requests based on wind resources within the scope of the RUG have been restructured. In cases where incomplete or incorrect data are entered into the Renewable Energy Projects Evaluation and Monitoring System operated by the General Directorate, such applications are rejected during the technical evaluation stage on the grounds of non-compliance. During the approval process of application croquis, only documents approved by Licensed Cadastral and Surveying Engineering Offices or Cadastral Directorates are deemed valid. Thus, the obligation for technical documents to be prepared and verified by authorized institutions or licensed offices has been expressly stipulated.</p><p data-start="8488" data-end="9798">For applications deemed suitable as a result of the technical evaluation, the technical evaluation report is now transmitted in its approved form directly to the relevant grid operator. In the previous regulatory period, unlicensed generation applications were generally not permitted within the plant site that was the subject of a pre-license or generation license application, and applications submitted within this scope were returned directly. Following the Amendment Regulation, this approach has been updated and, pursuant to RUG, it has been stipulated as a rule that unlicensed applications may not be filed for pre-license sites or for facility sites that are the subject of a generation license application. However, a limited exception has been introduced allowing the establishment of an unlicensed generation facility on the same site as licensed generation facilities, provided that connection is made from the same metering point. Within this exception, it has been made mandatory that the connection and system use agreements be arranged with zero in the delivery direction, and in the event of any energy flow to the grid, such energy shall not be subject to settlement or netting transactions and shall be deemed a gratuitous contribution to the Renewable Energy Resources Support Mechanism.</p><p data-start="9800" data-end="9880"><strong>5. What Changes Have Been Made in the Power Plant Site Determination Methods?</strong></p><p data-start="9882" data-end="10173">In Annex-1 of the Regulation, the section titled “<em>Power Plant Site Determination Methods</em>” sets out the principles of Method-1 and Method-2, which clearly define how the boundaries of the power plant site are to be determined, including the technical distance rules and coordinate procedures.</p><p data-start="9882" data-end="10173">• According to Method-1, the power plant site covers not only the turbine locations but also the areas formed by the rotor blade diameters of the wind turbines, as well as any electricity storage facilities and auxiliary resource units. Accordingly, this method has been updated to also cover hybrid and storage plants. For each turbine, the radius of the circumcircle of the polygon created is set at 700 (seven hundred) meters, and where the distance between turbines exceeds 1000 (a thousand) meters, no technical evaluation is conducted. In addition, with the introduction of the “cluster” concept, a requirement has been introduced to provide corner coordinates consecutively and in sequence, thereby allowing the proper operation of automatic verification processes in digital systems.</p><p data-start="10970" data-end="11451">• With the amendment made in Method-2, the method for determining the power plant site in applications within the scope of RUG has been simplified, and the technical criteria have been made variable according to the turbine type. The circle method previously defined with a fixed maximum radius of 500 (five hundred) meters has been abolished; instead, it is stipulated that the power plant site boundary be formed on the basis of a radius equal to each turbine’s rotor blade length.</p><p data-start="11453" data-end="11856">It has been stipulated that, in applications involving more than one turbine, Method-1 shall apply, and the conditions that the sites be contiguous and that the specific plant installed capacity density be 3 MWm/km² or above shall be maintained. In addition, in land-based unlicensed generation applications, the rule that sites may not overlap has been explicitly regulated by the Amendment Regulation.</p><p data-start="11858" data-end="11875"><strong>III. CONCLUSION</strong></p><p data-start="11877" data-end="12597">The Amendment Regulation has introduced a new approach to wind energy investments by removing the safety buffer zone application from the scope of technical evaluation and adopting a framework based on license site boundaries. By clarifying the methods for determining power plant sites, it has eliminated ambiguities in technical criteria. Granting grid operators the authority to verify notarized letters of consent has strengthened both document authenticity and technical compliance by shifting the audit process to the application stage. Furthermore, the provision requiring the Technical Evaluation Report to be submitted directly to the grid operator has simplified the administrative dimension of the procedures.</p><p data-start="12599" data-end="12843">Taken together, these elements demonstrate that the Amendment Regulation constitutes a comprehensive reform that enhances technical compliance criteria, clarifies administrative procedures, and reduces uncertainties in practical implementation.</p><p data-start="12599" data-end="12843">You can access the Amendment Regulation via this <a href="https://www.resmigazete.gov.tr/eskiler/2025/10/20251001-1.htm">link</a>.</p><p data-start="12599" data-end="12843">Makalenin Türkçe versiyonuna ulaşmak için bu <a href="http://www.aydin.law/wp-content/uploads/2025/10/Ruzgar-Kaynagina-Dayali-Elektrik-Uretimi-Basvurularinda-Teknik-ve-Hukuki-Sureclerin-Yeniden-Yapilandirilmasi.pdf">bağlantıya</a> tıklayınız.</p>						</div>
				</div>
					</div>
				</div>
				<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-11-09-04-43-2-e1746715344416.jpg" alt="Doğa Kale">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Doğa Kale</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Associate</div>
			
			
							<div class="wpr-member-description">+90 552 452 13 71<br>
doga.kale@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/03/PHOTO-2025-03-10-12-47-24-e1741603819818.jpg" alt="Aleyna Altın">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Aleyna Altın</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Legal Intern</div>
			
			
							<div class="wpr-member-description">+90  533 918 83 83
<br>
aleyna.altin@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2025/10/21/restructuring-of-technical-and-legal-processes-in-applications-for-electricity-generation-using-wind-resources/">Restructuring Of Technical And Legal Processes In Applications For Electricity Generation Using Wind Resources</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Communiqué Amending The Communiqué On Domestic Goods Has Been Published</title>
		<link>https://www.aydin.law/2025/10/16/the-communique-amending-the-communique-on-domestic-goods-has-been-published/</link>
		
		<dc:creator><![CDATA[Serhat Aydın]]></dc:creator>
		<pubDate>Thu, 16 Oct 2025 07:31:52 +0000</pubDate>
				<category><![CDATA[Insights]]></category>
		<guid isPermaLink="false">https://www.aydin.law/?p=13296</guid>

					<description><![CDATA[<p>I. INTRODUCTIONIn today’s competitive business environment, strategic advantages play a vital role in enabling companies to achieve sustainable growth and financial strength. In this context, the Domestic Goods Certificate issued for products manufactured in Türkiye stands out as more than a mere certificate—it serves as...</p>
<p><a href="https://www.aydin.law/2025/10/16/the-communique-amending-the-communique-on-domestic-goods-has-been-published/">The Communiqué Amending The Communiqué On Domestic Goods Has Been Published</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></description>
										<content:encoded><![CDATA[		<div data-elementor-type="wp-post" data-elementor-id="13296" class="elementor elementor-13296">
				<div class="elementor-element elementor-element-0a95a1c e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no e-con e-parent" data-id="0a95a1c" data-element_type="container">
					<div class="e-con-inner">
				<div class="elementor-element elementor-element-dee6bc7 elementor-widget elementor-widget-text-editor" data-id="dee6bc7" data-element_type="widget" data-widget_type="text-editor.default">
				<div class="elementor-widget-container">
							<p data-start="247" data-end="651"><strong data-start="247" data-end="266">I. INTRODUCTION</strong><br data-start="266" data-end="269" />In today’s competitive business environment, strategic advantages play a vital role in enabling companies to achieve sustainable growth and financial strength. In this context, the Domestic Goods Certificate issued for products manufactured in Türkiye stands out as more than a mere certificate—it serves as a valuable instrument offering significant opportunities for businesses.</p><p data-start="653" data-end="1094">The Domestic Goods Certificate provides companies with various advantages, provided that the local content ratio in the production process is at least 51%. These advantages include a price preference of up to 15% in public procurements, additional points in KOSGEB supports, access to interest-free loans, and tax incentives. Such benefits enable businesses to reduce costs, enhance competitiveness, and contribute to the national economy.</p><p data-start="1096" data-end="1669">On 15 October 2025, the Ministry of Industry and Technology (the “<strong>Ministry</strong>”) published the Communiqué Amending the Communiqué on Domestic Goods (SGM-2024/10) (the “<strong>Amending Communiqué</strong>”). The Amending Communiqué introduces amendments to the Communiqué on Domestic Goods (the “<strong>Communiqué</strong>”), which was published in the Official Gazette No. 32793 dated 25 January 2025 and sets out the procedures and principles regarding the determination and certification of whether a product, for which an enterprise applies for a Domestic Goods Certificate, qualifies as a domestic good.</p><p data-start="1671" data-end="1891">In this article, we will discuss the significant amendments introduced by the Amending Communiqué—some of which will enter into force on 5 November 2025 and others on 1 January 2026—and their implications for businesses.</p><p data-start="1898" data-end="1924"><strong data-start="1898" data-end="1924">II. GENERAL PRINCIPLES</strong></p><p data-start="1926" data-end="2417"><strong data-start="1926" data-end="1972">1. What Is the Local Content Ratio Report?</strong></p><p data-start="1926" data-end="2417">Article 1 of the Amending Communiqué adds the definition of the “Local Content Ratio Report” to paragraph 1 of Article 3 of the Communiqué, which sets out the relevant definitions. This definition clarifies that the Local Content Ratio Report is a report prepared, upon the manufacturer’s request, for products and inputs whose local content ratio is less than 51%. The report in question will be prepared by the relevant chamber or exchange.</p><p data-start="2419" data-end="3015"><strong data-start="2419" data-end="2507">2. What Are the Conditions for Software Products to Be Recognized as Domestic Goods?</strong></p><p data-start="2419" data-end="3015">Article 2 of the Amending Communiqué revises paragraph 3 of Article 4 of the Communiqué, which governs the conditions under which software products are recognized as domestic goods. The requirement to possess a Technological Product Certificate issued by the Ministry has been preserved. In addition, it has been stipulated that for software products holding such a Technological Product Certificate, the Local Content Ratio shall be deemed 100% in the Domestic Goods Certificate issued for such products.</p><p data-start="3017" data-end="3418"><strong data-start="3017" data-end="3096">3. What Is the Scope of the Term “General Expenses Related to the Product”?</strong></p><p data-start="3017" data-end="3418">Article 3 of the Amending Communiqué introduces a revision to Article 8 of the Communiqué, which governs the calculation of the Local Content Ratio. The amendment clarifies which expenses are included under the term “general expenses related to the product” when calculating the costs of domestic and imported inputs.</p><p data-start="3420" data-end="3824">The general expense items related to the product are listed as follows:</p><p data-start="3420" data-end="3824">• Maintenance and repair expenses for machinery and equipment<br data-start="3555" data-end="3558" />• Rental expenses<br data-start="3575" data-end="3578" />• Depreciation expenses<br data-start="3601" data-end="3604" />• Energy, transportation, and water expenses<br data-start="3648" data-end="3651" />• Research and development and design expenses recorded as direct costs<br data-start="3722" data-end="3725" />• Research and development and design expenses amortized through depreciation, and similar expenses</p><p data-start="3826" data-end="4757"><strong data-start="3826" data-end="3915">4. Which Inputs Are Included as 100% Domestic in the Local Content Ratio Calculation?</strong></p><p data-start="3826" data-end="4757">Another important amendment introduced by Article 3 of the Amending Communiqué to Article 8 of the Communiqué concerns the classification of inputs that are to be included as 100% domestic in the Local Content Ratio calculation:</p><p data-start="3826" data-end="4757">• Electricity, water, and natural gas inputs<br data-start="4193" data-end="4196" />• Expenses related to patents, utility models, industrial designs, and trademarks directly used in the production of the product, provided that the initial registration of the relevant intellectual and industrial property rights has been made with the Turkish Patent and Trademark Office on behalf of a company established in Türkiye<br data-start="4529" data-end="4532" />• Products obtained as inputs from recycling activities carried out by an enterprise holding a license under the Environmental Permit and License Regulation, published in the Official Gazette No. 29115 dated 10 September 2014</p><p data-start="4759" data-end="5343"><strong data-start="4759" data-end="4825">5. What Are the Other Amendments Introduced by the Communiqué?</strong></p><p data-start="4759" data-end="5343">Article 3 of the Amending Communiqué adds a ninth paragraph to Article 8 of the Communiqué, stipulating that inputs whose invoice amount exceeds 0.5% of the product cost and for which the Local Content Ratio has not been calculated shall be included in the Local Content Ratio calculation as domestic inputs at a rate determined by the Ministry, provided that such inputs are produced by an enterprise holding an industrial registration certificate in which the relevant input is listed under the production code.</p><p data-start="5345" data-end="5720">The same article also adds a tenth paragraph to the Communiqué, providing that the Ministry will publish a list of inputs that are not produced or are produced in limited quantities in Türkiye and are sourced from abroad. These inputs will be included in the Local Content Ratio calculation as imported inputs using coefficients between 0 and 1, as announced by the Ministry.</p><p data-start="5727" data-end="6148"><strong data-start="5727" data-end="5746">III. CONCLUSION</strong></p><p data-start="5727" data-end="6148">The published Amending Communiqué has rendered the implementation of the Domestic Goods Certificate clearer and more systematic. The regulations introduced regarding the calculation of the local content ratio, the scope of general expenses, and the classification of certain inputs as domestic contribute to reducing practical uncertainties and facilitate the certification process for businesses.</p><p data-start="6150" data-end="6568">The Domestic Goods Certificate is not merely an administrative requirement for companies; it also serves as a tool to enhance competitiveness. By providing price advantages in public procurements and priority in various incentive programs, the certificate strengthens the financial position of businesses, while its support for domestic production and alignment with sustainability objectives confer strategic value.</p><p data-start="6570" data-end="6669">Click <a href="https://www.resmigazete.gov.tr/eskiler/2025/10/20251015-4.pdf">here</a> to access the Amendment Communiqué.<br data-start="6616" data-end="6619" />Click <a href="https://www.resmigazete.gov.tr/eskiler/2025/01/20250125-3.htm">here</a> to access the Local Content Communiqué.</p><p data-start="6570" data-end="6669">Makalenin Türkçe versiyonuna ulaşmak için bu <a href="http://www.aydin.law/wp-content/uploads/2025/10/Yerli-Mali-Tebliginde-Degisiklik-Yapilmasina-Dair-Teblig-Yayimlandi.pdf">bağlantıya</a> tıklayınız. </p>						</div>
				</div>
					</div>
				</div>
				<section class="elementor-section elementor-top-section elementor-element elementor-element-5f4f013d0 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="5f4f013d0" data-element_type="section">
							<div class="elementor-background-overlay"></div>
							<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f92cb81" data-id="4f92cb81" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<section class="elementor-section elementor-inner-section elementor-element elementor-element-74bf904 elementor-section-boxed elementor-section-height-default elementor-section-height-default wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no parallax_section_no qode_elementor_container_no" data-id="74bf904" data-element_type="section">
						<div class="elementor-container elementor-column-gap-default">
					<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-12f95fe7" data-id="12f95fe7" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-9279f77 wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="9279f77" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="https://www.aydin.law/wp-content/uploads/2025/01/AYDIN-LAW-02-scaled-e1770107474574.jpg" alt="Serhat Aydın">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Serhat Aydın</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Managing Partner</div>
			
			
							<div class="wpr-member-description">+90 532 242 10 28<br>
serhat.aydin@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
				<div class="elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-ebbb54b" data-id="ebbb54b" data-element_type="column">
			<div class="elementor-widget-wrap elementor-element-populated">
						<div class="elementor-element elementor-element-a3a399a wpr-team-member-divider-center elementor-widget elementor-widget-wpr-team-member" data-id="a3a399a" data-element_type="widget" data-widget_type="wpr-team-member.default">
				<div class="elementor-widget-container">
			
	<div class="wpr-team-member">
					
			<div class="wpr-member-media">
				<div class="wpr-member-image">
					<img decoding="async" src="http://www.aydin.law/wp-content/uploads/2025/10/WhatsApp-Image-2025-10-09-at-1.15.02-PM-e1760005142973.jpeg" alt="Sinem Sedef">
				</div>
							</div>
				
		
		<div class="wpr-member-content">
			<h3 class="wpr-member-name">Sinem Sedef</h3>
							<div class="wpr-member-divider"></div>
			
							<div class="wpr-member-job">Legal Intern</div>
			
			
							<div class="wpr-member-description">+90 538 343 30 11<br>
sinem.sedef@aydin.law</div>
						
					</div>

			</div>

			</div>
				</div>
					</div>
		</div>
					</div>
		</section>
					</div>
		</div>
					</div>
		</section>
				</div>
		<p><a href="https://www.aydin.law/2025/10/16/the-communique-amending-the-communique-on-domestic-goods-has-been-published/">The Communiqué Amending The Communiqué On Domestic Goods Has Been Published</a> yazısı ilk önce <a href="https://www.aydin.law">Aydın Law</a> üzerinde ortaya çıktı.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
